HomeMy WebLinkAbout20261023_Albany Active Transportation Plan 2026 Appendix_PWALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | a
Albany Active
Transportation
Plan 2026
APPENDIX
Prepared for the City of Albany
September 2026
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX
ACKNOWLEDGMENTS
CITY STAFF
Justin Fried,
Transportation and
Sustainability Manager
Ben Matlaw,
Associate Transportation Planner
Jeff Bond,
Community Development Director
(2024-2025)
Mark Hurley,
Public Works Director
Dina Tasini,
Community Development Director
TECHNICAL ADVISORY COMMITTEE MEMBERS
Toshi Shepard-Ohta,
Metropolitan Transportation Commission
Suzanne Wilson,
East Bay Regional Parks District
Carissa Lee,
Alameda-Contra Costa Transit District
Hunter Oatman-Stanford,
Caltrans
TRANSPORTATION
COMMISSION MEMBERS
Julian Baldwin
Michael Barnes
Ellen Heile
Farid Javandel
Judy Kerr
Ken McCroskey
Britt Tanner Thesen
Anthony Ugalde
Sarah Zyba
Scot Jaffe,
Albany Unified School District
James Boito,
Albany Fire Department
Justin Kurland,
Albany Police Department
James Cirelli,
Albany Public Works Department
Brennen Brown,
Albany City Administration
Dani Dynes,
City of Berkeley
Jarrett Mullen,
City of El Cerrito
Janney Lockman,
City of Richmond
Aleida Andrino-Chavez,
Alameda County Transportation
Commission
Humberto Salvador Castro,
UC Berkeley
City of Albany
1000 San Pablo Ave
Albany, CA 94706
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX
TABLE OF CONTENTS
APPENDIX A. Project List ......................................................................1
APPENDIX B. Stakeholder Engagement Details ...............................9
APPENDIX C. Uptown Solano Avenue Bike Facility Analysis .......94
| 1ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
APPENDIX A: PROJECT LIST
| 2ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
APPENDIX A: PROJECT LIST
The priority projects summarized in ATP Chapter 6 are a subset of the larger list of projects
required for full buildout of the pedestrian and biking networks. Provided on the following
pages, the full project list is divided into four categories by project priority and status:
Priority Projects: Under Development
Priority Projects: Not Yet Initiated
Other Identified Projects on High-Comfort Network
Other Identified Projects
The three projects listed below were fully funded and in progress at the time of ATP
adoption. They are listed here for context, but are not included in the current ATP project
recommendations or project list:
Marin Ave Paving (Key Route Blvd to Tulare Ave)
Cleveland Cycle Track (Washington Ave to Cleveland Ave)
Jackson Bikeway (Buchanan St to Ohlone Ave)
| 3ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
ALBANY ACTIVE TRANSPORTATION PLAN - APPENDIX A: PROJECT LIST SEPTEMBER 2026
Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)
Priority Projects: Under Development
Pedestrian Santa Fe Ave
Pedestrian Corridor
North City
Limit
Key Route
Blvd
Traffic calming; intersection improvements at Santa
Fe Ave/Key Route Blvd; traffic signal improvements
at Santa Fe Ave/Solano Ave and Santa Fe Ave/
Marin Ave
- Widen sidewalks to 5' standard
- Pedestrian improvements at Santa Fe Ave/Key Route Blvd intersection
- Traffic calming such as speed humps mid-block & mini traffic circles at stop-controlled
intersections
- Traffic signal improvements at Santa Fe Ave/Solano Ave and Santa Fe Ave/Marin Ave
- Consider additional width, crossing treatments, lighting, and other amenities as ped
priority corridor
- Consider additional elements listed in Marin Elementary School Access Improvements
project
Pedestrian Thousand Oaks Blvd
Sidewalk
Pomona Ave Carmel Ave Install 5' sidewalks where missing north of Memorial
Park
- Install 5' sidewalks where missing north of Memorial Park
Pedestrian Uptown Solano Ave
ADA Curb Ramps
Key Route
Blvd
Tulare Ave Upgrade curb ramps between Key Route Blvd and
Tulare Ave
- Upgrade curb ramps between Key Route Blvd and Tulare Ave
Biking Adams-Clay Bikeway San Pablo
Ave-Clay St
Buchanan St One-way motor vehicle traffic and contraflow
bike lane with intersection treatments to facilitate
through movements by bike
- One-way motor vehicle traffic with contraflow bike lane
- Intersection treatments, potentially including new intersection controls, to facilitate through
movements by bike across larger streets such as Washington and Solano
- Traffic calming to limit vehicle speed <20 MPH to supplement striping
Biking Kains Ave Bikeway North City
Limit
South City
Limit
One-way motor vehicle traffic and contraflow bike
lane (North City Limit to Marin Ave) and two-way
bike boulevard (Marin Ave to South City Limit)
with intersection treatments to facilitate through
movements by bike
- One-way motor vehicle traffic and contraflow bike lane (North City Limit to Marin Ave) and
two-way bike boulevard (Marin Ave to South City Limit)
- Intersection treatments, potentially including new intersection controls, to facilitate through
movements by bike across larger streets such as Brighton, Portland, Washington
- Traffic calming to limit vehicle speed <20 MPH to supplement striping
Shared-Use
Path/Trail
Pierce-Cleveland
Connector Path
Cleveland Ave Pierce St Shared-use path connecting Pierce St to Cleveland
Ave via Pierce St Park
- Shared-use path connecting Pierce St to Cleveland Ave via Pierce St Park including
sections of existing path
Priority Projects: Not Yet Initiated
Pedestrian &
Biking
Garfield Ave-Ohlone
Crossing & Sidewalk
Gap
Ohlone
Greenway/
Masonic Ave
Pedestrian and biking/rolling crossing connecting
Garfield Ave to Ohlone Greenway across Masonic
Ave
- Pedestrian and biking/rolling crossing connecting Garfield Ave to Ohlone Greenway
across Masonic Ave
Pedestrian &
Biking
Key Route Blvd
Streetscape
Improvements
North City
Limit
Solano Ave Improve pedestrian experience; median stops for
cross-streets where missing; mid-block crossing
between street median and High School for student
use; protected bikeway OR buffered bike lanes OR
median path
- Widen sidewalks to 5' standard
- Consider median path and/or median changes
- Consider east-west median stop controls, potentially in coordination with east-west
corridor projects
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
- Protected bikeway or buffered bike lanes (likely parking impact)
- Consider additional elements listed in Albany Middle School Access Improvements &
Albany High School Access Improvements projects
Pedestrian &
Biking
Lower Marin
Ave Streetscape
Improvements
San Pablo Ave Masonic Ave Improve pedestrian experience; intersection
improvements at Marin Ave/San Pablo Ave and
Marin Ave/Talbot Ave; protected bikeway
- Protected bikeway including parking-protected options
- Protected intersection or other crossing treatments at Marin Ave/San Pablo Ave and
Marin Ave/Talbot Ave
- Consider additional sidewalk width, crossing treatments, lighting & other amenities as ped
priority corridor
Pedestrian &
Biking
Mid-Marin Ave
Streetscape
Improvements
Masonic Ave Tulare Ave Protected bikeway; improve pedestrian experience;
crossing enhancements
- Protected bikeway including parking-protected options
- Intersection controls at Marin Ave/Santa Fe Ave and Marin Ave/Curtis St to facilitate
north-south bike movement
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
- Consider additional elements listed in Marin Elementary School Access Improvements
project
Page 1 of 6
| 4ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
ALBANY ACTIVE TRANSPORTATION PLAN - APPENDIX A: PROJECT LIST SEPTEMBER 2026
Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)
Priority Projects: Under Development
Pedestrian &
Biking
Uptown Solano
Ave Streetscape
Improvements
Masonic Ave Tulare Ave Streetscape improvement project (including
pavement, drainage, lighting, green infrastructure,
improved sidewalks and curb extensions);
eastbound/uphill protected bikeway; westbound/
downhill shared lane with parking converted to
parallel; traffic signal improvements at Solano Ave/
Santa Fe Ave; consider signal at Solano Ave/
Peralta Ave; crossing improvements at Solano Ave/
Curtis St
- Streetscape improvement project including pavement, drainage, lighting, green
infrastructure, bicycle and pedestrian improvements
- Parallel parking on north side of street and uphill protected bikeway between angled
parking and sidewalk on south side of street
- Traffic signal improvements at Solano Ave/Santa Fe Ave
- Consider signal at Solano Ave/Peralta Ave
Pedestrian Cerrito Creek
Pedestrian Connection
Adams St Albany Hill
Trails
Pedestrian path along south side of Cerrito Creek
connecting Orientation Center path at Adams St to
Albany Hill Trails
- Pedestrian path along south side of Cerrito Creek connecting Orientation Center path at
Adams St to Albany Hill Trails
Pedestrian Hillside Ave Sidewalk
Gap
Jackson St Taft St Install 5' sidewalks where missing - Install 5' sidewalks where missing
Pedestrian Pierce St South
Pedestrian Corridor
Midblock near
Albany Hill
Buchanan St Address parking on sidewalk and provide an
accessible path for pedestrians which may include
new parking lanes, parking restrictions and/or right-
of-way modifications
- Address parking on sidewalk to provide an accessible path for pedestrians which may
include new parking lanes, parking restrictions and/or right-of-way modifications
- Widen sidewalk to 5' standard
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
Biking Adams-Carlson
Bikeway Connection
North City
Limit
Clay St Biking/rolling connection across Cerrito Creek
connecting to Carlson St in El Cerrito
- Biking/rolling connection across Cerrito Creek connecting to Carlson St in El Cerrito
Biking Jackson-Adams
Bikeway Connection
Pierce St San Pablo
Ave
Two-way separated bikeway along Buchanan St
between Jackson St and Adams St; intersection
improvements at Buchanan St/Jackson St
- Two-way separated bikeway along north side of Buchanan St between Jackson St and
Adams St, using space from realigning Buchanan St/Marin Ave merge identified in 2013
Complete Streets report and subsequent design development
- Intersection improvements at Buchanan St/Jackson St, potentially including updated
signage & right turn on red restrictions per 2013 Complete Streets report
- Consider additional elements listed in Ocean View Elementary School Access
Improvements project
Biking San Pablo Ave Cycle
Track & Marin Ave
Intersection
Marin Ave Village
Creek
Extension of two-way protected bikeway (cycle
track) along San Pablo Ave from Village Creek to
Marin Ave; intersection improvements at San Pablo
Ave/Marin Ave
- Extension of two-way protected bikeway (cycle track) along west side of San Pablo Ave
from current terminus on the south side of Village Creek to Marin Ave
- Protected intersection treatments or other crossing treatments at San Pablo Ave/Marin
Ave
Shared-Use
Path/Trail
Bay Trail Junctions Albany Bulb I-580 Off
Ramp
Improve trail junctions at Albany Bulb entrance and
I-580 off-ramp intersection
- Improve trail junctions at Albany Bulb entrance and I-580 off-ramp intersection
Shared-Use
Path/Trail
Ohlone Greenway
Expansion
North City
Limit
South City
Limit
Widen facility and/or better separate modes; create
direct connection to Albany Middle School
- Widen facility and/or consider separating uses among high-speed biking/rolling, low-speed
biking/rolling, and pedestrian modes
- Create direct connection to Albany Middle School parking lot
- Consider additional elements listed in Albany Middle School Access Improvements project
School Access Albany High School
Access Improvements
Intersection improvements at Key Route Blvd/
Portland Ave, Portland Ave/Ramona Ave, Portland
Ave/Pomona Ave, and Thousand Oaks Blvd/Key
Route Blvd; mid-block pedestrian crossing and
traffic calming along Key Route Blvd
- Intersection crossing treatments at Key Route Blvd/Portland Ave, Portland Ave/Ramona
Ave, Portland Ave/Pomona Ave, and Thousand Oaks Blvd/Key Route Blvd to support safe
routes to Albany High School, which may include median stop control (along Key Route
Blvd), striping, crosswalk enhancements, curb extensions, lighting, and signage
- New mid-block pedestrian crossing along Key Route Blvd which may include crosswalk
striping and enhancements, traffic calming (speed bumps/tables, raised crosswalks),
RRFBs, lighting, and signage.
- Consider additional elements listed in Key Route Blvd, Portland Ave & Thousand Oaks
Blvd corridor projects
Page 2 of 6
| 5ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
ALBANY ACTIVE TRANSPORTATION PLAN - APPENDIX A: PROJECT LIST SEPTEMBER 2026
Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)
Priority Projects: Under Development
School Access Albany Middle School
Access Improvements
Direct bike/ped connection between Ohlone
Greenway and Albany Middle School; improve
vehicle loading and circulation, including potential
changes/restrictions along Brighton Ave and San
Gabriel Ave
- Circulation and access improvements to support safe routes to Albany Middle School,
including evaluating a new direct connection between to Ohlone Greenway
- Additional intersection crossing treatments and/or measures to prevent use of red zones
for loading
- Evaluate vehicle circulation changes or movement restrictions on Brighton Ave & San
Gabriel Ave corridors
- Consider additional elements listed in Spokane-Behrens Bikeway Connection project plus
Brighton Ave, Key Route Blvd & Ohlone Greenway corridor projects
School Access Cornell Elementary
School Access
Improvements
Intersection improvements at Solano Ave/Talbot
Ave, Solano Ave/Cornell Ave, and Marin Ave/Talbot
Ave; improve vehicle circulation and bike/ped
school access
- Intersection crossing treatments at Solano Ave/Talbot Ave, Solano Ave/Cornell Ave, and
Marin Ave/Talbot Ave to support safe routes to Cornell Elementary School, which may
include crosswalk enhancements, RRFBs, lighting, and signage
- Evaluate vehicle circulation changes & additional bike/ped improvements, including
sidewalk widening, along Talbot Ave and Cornell Ave
- Consider additional elements listed in Solano Ave & Talbot Ave corridor projects
Other Identified Projects on High Comfort Networks
Pedestrian Brighton St Pedestrian
Corridor
San Pablo Ave Key Route
Blvd
Improve pedestrian access routes, improve
pedestrian experience, particularly on school side;
school-time traffic restrictions OR other circulation
changes by Albany Middle School
- Widen sidewalks to 5' standard
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor, particularly on school side
- Consider additional elements listed in Albany Middle School Access Improvements project
Pedestrian Buchanan Complete
Streets Improvements
Pierce St San Pablo
Ave
Intersection improvements at Buchanan St/Pierce
St, Buchanan St/Jackson St, and Buchanan St/
Taylor St; improve pedestrian experience
- Improve pedestrian crossings at Buchanan St/Pierce St, Buchanan St/Jackson St &
Buchanan St/Taylor St
- Add new pedestrian crossings at Taylor St and/or Polk St
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
- Consider additional elements listed in Ocean View Elementary School Access
Improvements project
Pedestrian Dartmouth St-Francis
St Corridor
San Pablo Ave Peralta Ave Improve pedestrian access routes; improve
pedestrian experience; include short segments on
Santa Fe Ave and Pomona Ave
- Widen sidewalks to 5' standard
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
- Include short segments on Santa Fe Ave & Pomona Ave (also listed as separate project
corridors)
Pedestrian Downtown Solano Ave
Pedestrian Corridor
Jackson St Masonic Ave Intersection improvements at Solano Ave/Jackson
St; evaluate potential closure to motor vehicles
between Adams St and San Pablo Ave
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor, including ramp & striping upgrades at Solano Ave/Jackson St intersection
& crossing treatments at San Pablo Ave, Cornell Ave, Talbot Ave & Masonic Ave
intersections
- Adams St to San Pablo Ave: Consider closure to motor vehicles
- Consider additional elements listed in Cornell Elementary School Access Improvements
project
Pedestrian Jackson St North
Pedestrian Corridor
Hillside Ave/
Castro St
Buchanan St Improve pedestrian access routes including
crossing improvements at Jackson St/Solano Ave;
improve pedestrian experience, particularly near
Albany Children's Center
- Widen sidewalks to 5' standard
- Crossing improvements at Jackson St/Solano Ave
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor, particularly on school side
Pedestrian Peralta Ave Pedestrian
Corridor
Solano Ave South City
Limit
Improve pedestrian access routes; improve
pedestrian experience; consider signal at Solano
Ave/Peralta Ave
- Widen sidewalks to 5' standard
- Consider additional sidewalk width, crossing treatments, lighting & other amenities as ped
priority corridor
- Consider signal at Solano Ave/Peralta Ave
Page 3 of 6
| 6ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
ALBANY ACTIVE TRANSPORTATION PLAN - APPENDIX A: PROJECT LIST SEPTEMBER 2026
Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)
Priority Projects: Under Development
Pedestrian Pierce St North
Pedestrian Corridor
North City
Limit
Midblock
near Albany
Hill
Improve pedestrian access routes; improve
pedestrian experience
- Widen sidewalks to 5' standard
- Add new crossings and/or crossing improvements to enhance access to path on west
side of street
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
Pedestrian Portland Ave
Pedestrian Corridor
San Pablo Ave East City
Limit
Improve pedestrian access routes; improve
pedestrian experience
- Widen sidewalks to 5' standard
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
- Consider additional elements listed in Albany High School Access Improvements project
Pedestrian Posen Ave Pedestrian
Corridor
Peralta Ave East City
Limit
Improve pedestrian access routes; improve
pedestrian experience
- Widen sidewalks to 5' standard
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor, particularly on school side
Pedestrian Sonoma Ave
Pedestrian Corridor
Curtis St Tulare Ave Intersection improvements at Sonoma Ave/Curtis
St; improve pedestrian experience
- Intersection improvements at Sonoma Ave/Curtis St
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
Pedestrian Taft St Pedestrian
Corridor
North
Terminus
Hillside Ave Improve pedestrian access routes; improve
pedestrian experience
- Widen sidewalks to 5' standard
- Address driveway slopes, obstructions, and other access issues
Pedestrian Talbot Ave Pedestrian
Corridor
North City
Limit
South City
Limit
Intersection improvements at Talbot Ave/Marin Ave
and Talbot Ave/Solano Ave; widen sidewalks and/
or loading areas around school
- Widen sidewalks to 5' standard
- Intersection improvements at Talbot Ave/Marin Ave and Talbot Ave/Solano Ave
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor, particularly on school side
- Consider additional elements listed in Cornell Elementary School Access Improvements
project
Pedestrian Washington Ave
Pedestrian Corridor
Pierce St San Pablo
Ave
Address parking on sidewalk by establishing
new parking lanes and/or restrictions; improve
pedestrian experience
- Address parking on sidewalk by establishing new parking lanes and/or restrictions
- Consider additional width, crossing treatments, lighting & other amenities as ped priority
corridor
Biking Brighton St Bikeway San Pablo Ave Key Route
Blvd
Protected bikeway OR striped/buffered bike lanes - San Pablo Ave to Masonic Ave: Protected bikeway or striped/buffered bike lanes (likely
parking impact); Consider intersection controls at Kains to facilitate north-south bikeway
movement
- Masonic Ave to Key Route Blvd: Consider additional elements listed in Albany Middle
School Access Improvements project
Biking Curtis St Bikeway North City
Limit
South City
Limit
Bike boulevard treatments including intersection
treatments to facilitate through movements across
larger streets
- Bike boulevard striping & traffic calming to limit vehicle speed <20 MPH & volume
<2000 ADT
- Consider bike boulevard in downhill direction & striped bike lane in uphill direction
- Intersection treatments, potentially including new intersection controls, to facilitate through
movements across larger streets such as Thousand Oaks Blvd, Portland Ave, Washington
Ave, Solano Ave & Marin Ave
- Consider additional elements listed in Marin Elementary School Access Improvements
project
Biking Dartmouth St-Francis
St Bikeway
San Pablo Ave Peralta Ave Bike boulevard treatments - Bike boulevard striping & traffic calming to limit vehicle speed <20 MPH to supplement
existing striping
- Intersection bike crossing treatments, which may include stop control changes & striping
- Include short segments on Santa Fe Ave & Pomona Ave (also listed as separate project
corridors)
Page 4 of 6
| 7ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
ALBANY ACTIVE TRANSPORTATION PLAN - APPENDIX A: PROJECT LIST SEPTEMBER 2026
Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)
Priority Projects: Under Development
Biking Jackson St South
Bikeway
Buchanan St South City
Limit
Two-way protected bikeway along Jackson St;
connection to Codornices Creek Path; biking/rolling
connection to Berkeley bike network
- Two-way protected bikeway/multi-use path along east side of Jackson St
- Shared-use path connection to Codornices Creek Path
- Connection to Berkeley via 8th St Bike boulevard striping & traffic calming to limit vehicle
speed <20 MPH & volume <2000 ADT
- Consider alternate shared-use path connection to Berkeley at 9th St bike boulevard
- Consider additional elements listed in Ocean View Elementary School Access
Improvements project
Biking Posen Ave Bikeway Peralta Ave East City
Limit
Traffic calming to limit vehicle speeds; coordinate
with Berkeley on facility connections
- Traffic calming to limit vehicle speed & volume near school
- Coordinate with Berkeley to transition biking/rolling facilities through Monterey Ave
intersection
Biking San Pablo Ave
Bikeway
North City
Limit
South City
Limit
Protected bikeway along extent of San Pablo Ave - Long-term vision for protected bikeway (likely traffic/parking impacts) to achieve high-
comfort status, balanced with transit priority and other roadway functions
Biking Talbot Ave Bikeway North City
Limit
South City
Limit
Contraflow bike lane (north City limit to Brighton
Ave); school-time traffic restrictions OR other
circulation changes (between Solano Ave and
Marin Ave)
- North City Limit to Brighton Ave: Southbound bike boulevard striping & traffic calming;
northbound contra-flow constrained buffered bike lane
- Brighton Ave to South City Limit: Bike boulevard striping & traffic calming to limit vehicle
speed <20 MPH; consider school-time traffic restrictions or other circulation changes
between Solano Ave & Marin Ave
- Intersection treatments, potentially including new intersection controls, to facilitate through
movements by bike across larger streets such as Solano Ave & Marin Ave
- Consider additional elements listed in Cornell Elementary School Access Improvements
project
Biking Washington Ave
Bikeway
Jackson St Curtis St Bike boulevard treatments OR protected bikeway
OR striped/buffered bike lanes; improvements at
intersections where bicycle facilities intersect
- Bike boulevard striping & traffic calming to limit vehicle speed <20 MPH & volume
<2000 ADT
- Protected bikeway or striped/buffered bike lanes (likely parking impact)
- Intersection treatments, potentially including new intersection controls, to facilitate through
movements by bike across larger streets such as Adams St, Kains Ave & Curtis St
Shared-Use
Path/Trail
Village Creek Path Jackson St Monroe St-
San Pablo
Ave
Shared-use path connecting Jackson St to existing
segments of Village Creek path, San Pablo Ave &
Monroe St
- Shared-use path connecting Jackson St to existing segments of Village Creek path, San
Pablo Ave & Monroe St
School Access Marin Elementary
School Access
Improvements
Signal improvements at Marin Ave/Santa Fe Ave
and Marin Ave/Curtis St; intersection improvements
at Curtis St/Sonoma Ave; improve pedestrian
experience; improve vehicle loading and bike/ped
school access
- Intersection crossing treatments and/or signal improvements at Marin Ave/Santa Fe Ave,
Marin Ave/Curtis St & Curtis St/Sonoma Ave to support safe routes to Marin Elementary
School, which may include a pedestrian scramble, leading pedestrian indicator, no right
turns on red, crosswalk enhancements, curb extensions, lighting & signage
- Evaluate additional loading delineation to improve bike/ped access to school
- Consider additional elements listed in Marin Ave, Santa Fe Ave & Curtis St corridor
projects
School Access Ocean View
Elementary
School Access &
Buchanan Crossing
Improvements
Intersection improvements at Buchanan St/Pierce
St, Buchanan St/Taylor St, Buchanan St/Jackson
St, and Jackson St/Solano Ave
- Intersection crossing treatments at Buchanan St/Pierce St, Buchanan St/Taylor St,
Buchanan St/Jackson St & Jackson St/Solano Ave to support safe routes to Ocean View
Elementary School, which may include crosswalk enhancements, curb extensions, lighting
& signage
Other Identified Projects
Pedestrian Clay Connection Jackson St Madison St Trail/stairs connecting Jackson St to Madison St via
public right-of-way
- Trail/stairs connecting Jackson St to Madison St via public right-of-way
Pedestrian Cleveland Ave
Pedestrian Corridor
North City
Limit
Washington
Ave
Install 5' sidewalks where missing; address parking
on sidewalk through enforcement
- Install 5' sidewalks where missing
- Address parking on sidewalk through enforcement
Page 5 of 6
| 8ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX PROJECT LIST
ALBANY ACTIVE TRANSPORTATION PLAN - APPENDIX A: PROJECT LIST SEPTEMBER 2026
Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)Type Name Bound 1 Bound 2 Brief Description Detailed Description (May Contain Multiple Options)
Priority Projects: Under Development
Biking Buchanan-Eastshore
Undercrossing
Path
Switchback
North of
Bridge
Eastshore
Hwy
Improved connection between Buchanan St path
and Eastshore Hwy (e.g. lighting, motor vehicle
access restrictions, wayfinding)
- Improve biking connection between Buchanan St path and Eastshore Hwy, which may
include lighting, motor vehicle access restrictions, wayfinding, or other enhancements
Biking Carmel Ave Bikeway North City
Limit
Solano Ave Bike boulevard treatments - Bike boulevard striping and signage, potential traffic calming to limit vehicle speed <20
MPH
Biking Cleveland Ave
Bikeway
North City
Limit
Washington
Ave
Two-way protected bikeway OR striped bike lane - Two-way protected bikeway/multi-use path along west side or striped bike lanes (likely
parking impact)
Biking Downtown Solano Ave
Bikeway
San Pablo Ave Masonic Ave Eastbound/uphill protected bikeway; westbound/
downhill shared lane with parking converted to
parallel; intersection improvement at Solano Ave/
Talbot Ave
- Extend asymmetrical bikeway configuration analyzed for Uptown Solano Ave (Masonic
Ave to Tulare Ave)
- Consider intersection controls at Talbot Ave to facilitate north-south bikeway movement
- Consider additional elements listed in Cornell Elementary School Access Improvements
project
Biking Eastshore Hwy
Bikeway
Mid-block
crosswalk
South City
Limit
Protected bikeway OR striped bike lanes Protected bikeway or striped bike lanes (likely parking impact)
Biking Jackson St North
Bikeway
Hillside Ave-
Castro St
Buchanan St Bike boulevard treatments; potential northbound
bike lane (Solano Ave to Buchanan St)
- Hillside Ave/Castro St to Solano Ave: Bike boulevard striping & traffic calming to limit
vehicle speed <25 MPH & volume <3000 ADT
Biking Peralta Ave Bikeway Solano Ave South City
Limit
Traffic calming for shared facility; protected bikeway
OR striped bike lanes between Francis St & Posen
Ave with intersection improvements at Peralta Ave/
Posen Ave
- Traffic calming to limit vehicle speed <25 MPH to supplement existing sharrow striping
(one direction) & striped bike lane (one direction)
- Protected bikeway or striped bike lanes (likely parking impacts) between Francis St &
Posen Ave, with intersection controls at Peralta Ave/Posen Ave
Biking Portland Ave Bikeway San Pablo Ave East City
Limit
Bike boulevard treatments OR protected bikeway
OR striped/buffered bike lanes, intersection
improvements at Portland Ave/Kains Ave and
Portland Ave/Curtis St
- Bike boulevard striping & traffic calming (westbound only between Carmel Ave & Curtis St
to supplement existing eastbound striped lane)
- Protected bikeway or striped/buffered bike lanes (likely parking impact)
- Carmel Ave to Curtis St: Westbound striped/buffered bike lane to pair with existing
eastbound lane (likely parking impact)
- Consider intersection controls at Kains Ave/Curtis St to facilitate north-south bikeway
movement
- Consider additional elements listed in Albany High School Access Improvements project
Biking
Spokane-Behrens
Bikeway Connection
North City
Limit
Brighton Ave Biking/rolling connection between Spokane Ave
and Behrens St (in coordination with El Cerrito)
- Improve biking/rolling connection between Spokane Ave & Behrens St in coordination
with the City of El Cerrito
- Consider additional elements listed in Albany Middle School Access Improvements project
Page 6 of 6
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 9
APPENDIX B: STAKEHOLDER
ENGAGEMENT DETAILS
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 10
SUMMARY OF ENGAGEMENT ACTIVITIES
This appendix summarizes the stakeholder engagement activities completed during the development
of the Active Transportation Plan (ATP).
Stakeholder Engagement
Stakeholder engagement was central to the development of the
ATP. Engagement activities occurred across three primary phases
corresponding with the technical development phases shown in
Figure on the right, ensuring that stakeholder perspectives informed
all decisions and milestones. Multiple meetings and engagement
activities occurred within each phase to provide ongoing opportunities
for participation and feedback. Appendix B contains more details on
the stakeholder engagement process summarized in this chapter.
As depicted in Figure 2 and detailed in Table 1, each project phase
included a full cycle of stakeholder engagement with a consistent
sequence of meetings among the following stakeholder groups:
Technical Advisory Committee
Community Meetings and Online Comment Periods
Transportation Commission
City Council
Technical Advisory Committee (TAC)
The project team appointed a Technical Advisory Committee (TAC) to
guide the ATP’s technical development, findings, and decisions. The
TAC included representatives from the City of Albany, neighboring
cities, and stakeholder agencies as listed on the next page. TAC
meetings occurred in each project phase as listed in Table 1.
Community Meetings and Online
Comment Periods
Community meetings occurred during each engagement phase as
listed in Table 1. Each phase of community engagement included
both an in-person meeting and a multi-week online comment
period featuring the same materials as the in-person meeting in
an interactive online format. The materials included display boards,
slide presentations, and maps to share information and gather input.
Beyond serving as a platform to receive public feedback, the project
website also provided a central hub for project information including
draft materials and schedules of upcoming activities.
COMMUNITY MEETINGS & ONLINE COMMENT PERIODSTRANSPORTATION COMMIS-SIONCITY COUNCILTechnical Advisory Committee (TAC)Community Meetings & Online Comment Periods
Transportation Commission
City Council
TECHNICAL ADVISORY
COMMITTEE (TAC)
COMMUNITY MEETINGS
AND ONLINE COMMENT
PERIODS
TRANSPORTATION
COMMISSION
CITY COUNCIL
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 11
Transportation Commission
The project team presented to the Transportation Commission on the dates listed in Table 1,
corresponding to each phase of technical work. Commissioners provided technical and policy
feedback that helped shape project decisions and prepare for City Council briefings.
City Council
The project team presented to the City Council on the dates listed in Table 1, corresponding
to each phase of technical work, plus an additional meeting in summer 2026 for final adoption
of the ATP.
Focused Engagement with Albany Unified School District
Throughout the project, City staff also conducted focused outreach meetings with
representatives from the Albany Unified School District to discuss their priorities and review
draft findings. As detailed in Appendix B, this included individual meetings with school
principals, staff, students, and parents to discuss access considerations specific to each
school.
Focused Engagement on Uptown Solano Avenue
Beyond the standard three-phase structure of ATP engagement, the project team also met
with Albany business community stakeholders specifically to review concepts for Uptown
Solano Avenue (between Masonic Avenue and Tulare Avenue) as part of evaluating potential
bicycle facilities for Solano Avenue. This engagement included focused meetings with the
TAC, Transportation Commission, and City Council; a business survey addressing top priorities
and concerns for streetscape improvements on Solano Avenue; and broader community
review during the ATP engagement activities listed in Table 1, particularly during the second
phase focused on draft networks and potential projects.
TAC Membership
CITY OF ALBANY
• City Administration
• Albany Fire Department
• Albany Police Department
• Albany Public Works Department
NEIGHBORING CITIES
• City of Berkeley
• City of El Cerrito
• City of Richmond
LOCAL STAKEHOLDER AGENCIES
• Albany Unified School District
• UC Berkeley/University Village
REGIONAL STAKEHOLDER AGENCIES
• Alameda CTC
• MTC
• AC Transit
• East Bay Regional Parks District
• Caltrans
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 12
Table 1: Stakeholder Engagement Activities by Phase
ACTIVITY PHASE 1 PHASE 2 PHASE 3
Topics for Stakeholder Input Goals and existing conditions
assessment
Draft networks and
potential projects
Project and program
prioritization
TAC September 30, 2024 April 23, 2025 December 18, 2025
Community Meeting October 24, 2024 May 20, 2025 January 22, 2026
Online Comment Period October 2024–November 2024 May 2025–July 2025 January 2026–February 2026
Transportation Commission December 5, 2024 June 26, 2025 February 26, 2026
City Council February 18, 2025 October 20, 2025 April 20, 2026
Stakeholder Input
Appendix B contains more details on the community input collected.
Many comments shared common themes, which helped to inform the
project team’s existing conditions findings and recommendations for
policies, projects, and priorities detailed throughout this ATP. Some
of the key themes were:
While the active transportation networks are good overall,
many facilities remain challenging for both walking and biking
Intersections and pedestrian crossings are key areas for
improvement
More biking infrastructure is needed, especially separated/
protected bikeways
More traffic calming and enforcement are needed
Lighting and visibility should continue to be improved
School pickup/drop zones are very challenging at peak times
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 13
PHASE 1 ENGAGEMENT:
GOALS AND EXISTING CONDITIONS
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 14
Phase 1 Engagement: Goals & Existing Conditions
Phase 1 focused on introducing the ATP process, sharing draft ATP goals, and gathering input on existing conditions,
opportunities, and challenges.
Engagement Activities
Phase 1 engagement activities included:
• Technical Advisory Committee (TAC): September 30, 2024
• Community Meeting: October 24, 2024
• Online Comment Period: October 2024 to November 2024
• Transportation Commission: December 5, 2024
• City Council: February 18, 2025
Summary of Key Themes
The existing conditions phase included a six-week comment period in which the project team received over 700 comments via
in-person meetings and an online mapping tool. Many comments shared common themes, including:
• Many facilities remain challenging for walking, biking, and rolling (346 comments)
• Intersections and pedestrian crossings are key areas for improvement (232 comments)
• More bicycle infrastructure is needed (210 comments)
• More traffic calming and enforcement are needed (170 comments)
• Lighting and visibility should continue to be improved (81 comments)
• School pickup/drop zones are very challenging at peak times (66 comments)
The following pages contain a heatmap of community feedback received during this phase and samples of collateral materials
from the engagement activities.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 15
Comment Density Heat Map, Engagement Phase 1
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 16
Albany Active
Transportation Plan
Welcome to the
Community Open House
Please explore all stations
Ways to provide input:
https://bit.ly/AlbanyATP
•Leave comments on the maps or with staff
•Fill out the paper survey or identical survey online
•Place comments on the online map
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 17
Albany Active Transportation Plan
What is the Albany Active Transportation Plan?
The Albany Active Transportation Plan guides the development of infrastructure projects and programs to
support safe and comfortable bicycling, walking, and rolling in Albany.
The City of Albany is currently updating its Active Transportation Plan, which was developed in 2012 and last
updated in 2019. The update process is expected to last 12-15 months.
Active Transportation Plan: Project Timeline
Goals & Existing Conditions
Fall 2024 Draft Active Transportation
Network and Policies
Spring 2025
Draft Plan and Priority
Projects and Programs
Fall 2025
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 18
Provide an active transportation network that
encourages people of all ages and abilities to walk,
bike, and roll to meet their daily needs, including
access to transit, work, school, commerce, and
recreation.
Access & Connectivity
Design and maintain high-quality facilities that
make Albany a safe and comfortable place to
walk, bike, and roll.
Safety & Comfort
Ensure the needs of all users,
including disadvantaged populations, are
integral factors in project prioritization and
development.
Equitable Outcomes
Allocate sufficient resources to implement
active transportation projects and programs
on an ongoing basis.
Implementation & Funding
Albany Active Transportation Plan What is the Albany Active Transportation Plan? Draft Goals
Place sticky note comments here or on the map
The draft goals are based on shared community values, including access, safety, and equity. What values would you like to see incorporated into the ATP goals?
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 19
Albany Active Transportation Plan
Walking and Rolling in Albany Today
Where do you like walking/biking/rolling? Where are you hesitant to walk/bike/roll? How would you improve the experience?
Map of Existing Bike Network
Place sticky note comments here or on the map
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 20
Albany Active Transportation Plan
Walking and Rolling in Albany Today
Existing Bikeway Types Existing Pedestrian Infrastructure
Curb Extension
Rectangular RapidFlashingBeacon
and High Visibility Crosswalk
Pedestrian Hybrid Beacon LeadingPedestrian Interval
Shared Use Path Separated Bikeway
Paths that
can be used
by both
bicyclists and
pedestrians
and are
completely
separate from
the roadway
Curb Extensions extend the sidewalk
or curb line out into the parking lane,
reducing the effective street width and
crossing distance.
Pedestrian Hybrid Beacon is an
intermediate option between a
flashing beacon and full pedestrian
signal. It helps pedestrians safely cross
higher-speed roadways by assigning
right of way and providing positive
stop control.
Leading Pedestrian Intervals at signals
to provide pedestrians with their
own dedicated phase before turning
vehicles. This improves visibility of
pedestrians and reduces vehicle
conflicts.
Rectangular Rapid Flashing Beacon
(RRFB) installation at uncontrolled
crossings to increase driver awareness
of pedestrians at crosswalks.
Pedestrians can activate the flashing
signal with a button.
Lanes that are
painted on the
street and can
sometimes
include a
painted buffer
from vehicle
lanes
On-street
bikeways with
vertical, physical
separation from
the adjacent
lane; most
common on
high-speed
arterials
Shared lane
bikeways
accompanied
by speed
calming
measures like
speed humps
Streets with
different
types of bike
facilities in each
direction
Shared lane
bikeways that are
not accompanied
by speed calming
measures; may
see higher vehicle
volumes and
speeds than bike
boulevards
Bike Lane Bike Boulevard
Bike Route Mixed Bikeway Types
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 21
Albany Active Transportation Plan
Walking and Rolling in Albany Today
What is Bicycle Level of Traffic
Stress (LTS)?
Level of Traffic Stress (LTS) is a
rating given to a road segment
or crossing indicating the traffic
stress it imposes on bicyclists.
LTS ranges from 1 to 4 as
follows:
Map of Bicycle Level of Traffic Stress
Place sticky note comments here or on the map
Does this map reflect your comfort level when biking/rolling? Are there any locations where this does not reflect your experience?
Strong separation
except at low speed,
low volume traffic.
Suitable for children.
Involves interaction
with higher speed
traffic. A level
of stress only
acceptable to those
“strong and fearless.”
Except in low speed
and volume, people
biking have their own
place to ride. Most
adults can tolerate
4
Involves interaction with moderate speed or multilane traffic, or close proximity to higher speed traffic.
3
2
1
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 22
Albany Active Transportation Plan
Walking and Rolling in Albany Today
Map of Pedestrian Collisions, 2013-2022
This map shows pedestrian-involved collisions over the past 10 years
that resulted in an injury. There were 87 pedestrian injury collisions, with
1 fatal collision and 13 severe injury collisions. Safety projects have been
implemented in several locations where collisions are concentrated.
Map of Bike Collisions, 2013-2022
This map shows bike-involved collisions over the past 10 years that
resulted in an injury. There were 69 bike injury collisions, with 0 fatal
collisions and 4 severe injury collisions. Safety projects have been
implemented in several locations where collisions are concentrated.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 23
Take the Albany ATP Survey!
Take this survey to let us know how you walk, bike, and roll in Albany.
1. How do you typically travel to or within Albany? (Check all that apply)
☐ Walking
☐ Biking
☐ Scooting
☐ Driving
☐ Bus
☐ Train/BART
☐ Other (please specify)
2. Where do you typically bike or roll? (Check all that apply)
☐ Work
☐ School/taking children to school
☐ Errands
☐ Accessing transit (e.g. BART)
☐ Exercise or leisure
☐ None
☐ Other (please specify)
3. Where do you typically walk? (Check all that apply)
☐ Work
☐ School/taking children to school
☐ Errands
☐ Accessing transit (e.g. BART)
☐ Exercise or leisure
☐ None
☐ Other (please specify)
4. What barriers do you experience to walking, biking, or rolling? (Check all that apply)
☐ Distance
☐ Traffic safety
☐ Personal security concerns
☐ Physical ability
☐ Infrastructure (lack of bike lanes, crosswalks, bike parking, etc.)
☐ Other (please specify)
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 24
5. What do you like about walking, biking, or rolling in Albany?
6. What would you like to see changed or improved?
7. How old are you?
☐ Under 18
☐ 18-25
☐ 26-30
☐ 31-50
☐ 51-70
☐ Over 70
8. What is your race or ethnicity? (Check all that apply)
☐ Work
☐ School/taking children to school
☐ Errands
☐ Accessing transit (e.g. BART)
☐ Exercise or leisure
☐ None
☐ Other (please specify)
9. What is your gender?
☐ Female
☐ Male
☐ Non -binary
☐ Other (describe)
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 25
7/1/2026
1
Community Open House
October 24, 2024
City of Albany Active Transportation Plan (ATP)
Agenda
What is an Active Transportation Plan?
Background, process & schedule
Active Transportation Plan goals
Facility types & existing conditions
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 26
7/1/2026
2
What is an Active
Transportation Plan?
•Guides the development of infrastructure projects and programs to support safe and comfortable bicycling, walking, and rolling
•Serves as pedestrian and bicycle master plans
•Informs street design, capital project prioritization, and supportive policies and programs
•Current ATP was developed in 2012, and last updated in 2019
What Is an Active Transportation Plan?
3
4
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 27
7/1/2026
3
Background, Process &
Schedule
1997
Traffic
Management
Plan
2012
First Active
Transportation
Plan
2019
Active
Transportation
Plan Update
2023
Local Road
Safety Plan2019
Solano Avenue
Complete Streets
Study
2019
Climate Action
Plan
2015
General
Plan 2035
2024
Active
Transportation
Plan Update
Background, Process & Schedule
5
6
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 28
7/1/2026
4
Phase 1
Goals & Existing
Conditions
Phase 2
Draft Active
Transportation
Network &
Policies
Phase 3
Draft Plan &
Priority Projects
Fall 2024 Spring 2025 Fall 2025
Background, Process & Schedule
Active Transportation Plan
Goals
7
8
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 29
7/1/2026
5
Active Transportation Plan Goals
Centered around four areas of emphasis & shared values:
Access & connectivity
Safety & comfort
Equitable outcomes
Implementation & funding
Active Transportation Plan Goals
Goal 1: Access & Connectivity
Provide an active transportation network that encourages people of
all ages and abilities to walk, bike, and roll to meet their daily needs,
including access to transit, work, school, commerce, and recreation.
Goal 2: Safety & Comfort
Design and maintain high-quality facilities that make Albany a safe
and comfortable place to walk, bike, and roll.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 30
7/1/2026
6
Active Transportation Plan Goals
Goal 3: Equitable Outcomes
Ensure the needs of all users, including disadvantaged populations,
are integral factors in project prioritization and development.
Goal 4: Implementation & Funding
Allocate sufficient resources to implement active transportation
projects and programs on an ongoing basis.
Facility Types & Existing
Conditions
11
12
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 31
7/1/2026
7
Common Facility Types: Pedestrian
Recent Pedestrian Projects
1. Buchanan Street Bikeway and
Intersection Improvements
(2014)
2. Marin Avenue/Curtis Street
Safe Routes to Schools (2014)
3. San Pablo cycle track and
Pedestrian Beacon (2017)
4. Washington Avenue Access
and Traffic Calming (2020)
5. Talbot Pedestrian Beacon
(2020)
6. Ohlone Greenway Signalized
Intersection Improvements
(2024)
7. San Pablo Pedestrian Safety
Phase 1 (2024)
2 2
1 1
3
3
4
5
6
6
7
7
7
7
13
14
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 32
7/1/2026
8
Common Facility Types: Bicycle
Existing Bicycle Network
•Where do you like
walking/biking/rolling?
•Where do you find
walking/biking/rolling
challenging, would like
improvement, or do not
use at all due to the
challenges?
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 33
7/1/2026
9
Bicycle Level of Traffic Stress (LTS)
What is Bicycle Level of Traffic Stress?
1
Strong separation
except at low speed,
low volume traffic.
Suitable for children.
Except in low speed
and volume, people
biking have their own
place to ride. Most
adults can tolerate.
2
Involves interaction
with moderate speed
or multilane traffic, or
close proximity to
higher speed traffic.
Involves interaction with
higher speed traffic. A
level of stress only
acceptable to those
“strong and fearless.”
3 4
Bicycle Level of Traffic Stress (LTS)
Datasets don’t always tell
the whole story:
•Does this map reflect
your comfort level when
biking/rolling?
•Are there any locations
where this does not
reflect your experience?
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 34
7/1/2026
10
Project Website
bit.ly/AlbanyATP
•Provide your input here tonight,
or on our website
•Includes survey & interactive
mapping tool
Thank You
Active Transportation Plan Community Open House
October 24, 2024
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 35
PHASE 2 ENGAGEMENT:
ACTIVE TRANSPORTATION NETWORKS
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 36
Phase 2 Engagement: Active Transportation
Networks
Phase 2 engagement focused on reviewing draft bicycle and pedestrian networks at the corridor level and gathering feedback
on proposed improvements.
Engagement Activities
Phase 2 engagement activities included:
• Technical Advisory Committee (TAC): April 23, 2025
• Community Meeting: May 20, 2025
• Online Comment Period: May 2025 to July 2025
• Transportation Commission: June 26, 2025
• City Council: October 20, 2025
Summary of Key Themes: Pedestrian Network
The project team received 347 public comments (299 online, 48 in person) on the pedestrian/walking network. TAC members
also submitted 7 comments on the pedestrian/walking network and another 18 comments that applied to both networks.
1. Pedestrian Network Gaps
• Many specific locations identified (see detailed list of revisions).
• Improve connections with transit hubs, especially for seniors and disabled residents.
2. Crosswalks & Signals
• Unsafe or missing crosswalks, especially near schools and on the Ohlone Greenway. Suggested: new crossings,
raised crosswalks, and better visibility.
• Many crossings lack pedestrian signals, or existing signals have poor timing. Desire for countdowns, better walk
indicators, and lighted “No Right on Red” signs.
• Requests to adjust signal timing at intersections on San Pablo to reduce pedestrian wait time and people crossing at
red lights.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 37
3. Sidewalk Quality & Obstructions
• Calls to fix narrow, uneven, or blocked sidewalks. Noted issues with trash bins, poles, overgrowth, and construction
vehicles.
• Many sidewalks near schools and commercial areas need widening and paving.
4. School Zone Safety
• High volume of feedback concerned with school routes.
• Requests for crossing guards, no-drive zones, slow streets, and buffer zones near campuses.
• Common concern: drivers ignore signs, block crosswalks, or drive aggressively during pick-up/drop-off.
5. Traffic Calming for Pedestrian Safety
• Recurring requests for bulb-outs, raised crossings, speed bumps, and enforcement.
• Emphasis on high-traffic intersections and areas near Albany Hill, Cornell, and AMS/AHS.
6. Lighting
• Lighting requested at many intersections and crossings.
Summary of Key Themes: Biking Network
The project team received 214 public comments (152 online, 62 in person) on the biking/rolling network. TAC members also
submitted 19 comments on the biking/rolling network and another 18 comments that applied to both networks
1. Connectivity & Network Gaps
• Numerous suggestions call for connecting gaps in the bike network.
• Strong desire for better connectivity to neighboring cities. Bridge connections proposed to enhance regional
integration (El Cerrito, Richmond, Berkeley).
2. Bike Infrastructure Enhancements
• Protected bike lanes are in high demand.
• Calls to widen shared use paths, improve surface conditions, and enhance signage and visibility.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 38
3. Intersection Safety & Signalization
• Crossings at places like San Pablo, Marin, Santa Fe, and Kains were frequently cited.
• Suggested improvements included bike signals, bike boxes, HAWKs, RRFBs, more intersection daylighting, raised
crossings, and curb cuts.
4. Traffic Calming & Enforcement
• Many respondents emphasized speeding as a top danger, especially around schools and commercial corridors. They
cited a need for speed bumps, traffic circles, diverters, and no right on red signs.
• Specific corridors called out include Masonic, Dartmouth, and Brighton.
The following pages contain heatmaps of community feedback received during this phase and samples of collateral materials
from the engagement activities.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 39
Comment Density Heat Map for Pedestrian Network, Engagement Phase 2
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 40
Comment Density Heat Map for Biking Network, Engagement Phase 2
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 41
Albany Active Transportation Plan
Community Input & Key Findings
Gaps, challenges & areas for improvement:
• Collision hot spot locations
• North-south bike boulevards
• East-west connections
• School pickup/drop zones
• Commercial zones
• Major arterials and intersections
• Stop-controlled intersections
• Micromobility/personal electric vehicles
Map of Community Comments
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 42
Albany Active Transportation Plan “Nested” Priority Networks
A series of “nested” networks helps us prioritize active transportation modes
Full Mobility Network
Designated Active Transportation Network
Priority Active Transportation Network
Full Mobility Network
All streets, paths & trails citywide
Designated Active Transportation Network
Facilities specifically designated for active transportation:
▪ Pedestrian/walking network
▪ Biking/rolling network
Priority Active Transportation Network
Facilities with the highest levels of priority & treatment
for active transportation modes:
▪ Pedestrian/walking priority network
▪ Biking/rolling priority network
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 43
Biking/Rolling Corridor Types
Corridor Type #1: Narrower Local Street
1
Corridor Type #2: Wider Local Street/Collector
2
Corridor Type #3: Minor Arterial
3
Corridor Type #4: Major Arterial
4
Corridor Type #5: Ohlone Greenway
5
Corridor Type #6: Solano Avenue
6
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 44
Corridor Type #2: Wider Local Street/Collector Corridor Type #3: Minor Arterial
Some potential improvements for this corridor type are listed below, including likely benefits and tradeoffs. Which improvements, if any, would you prefer?
Corridor Type #1: Narrower Local Street
Example: Kains Ave, Curtis St, Adams St
Considerations:
• Traffic volumes are low, but speeds are higher than ideal
• Street width is narrow, requiring additional tradeoffs
• Street has multiple intersections where cross traffic does
not stop, creating challenging bicycle crossings
Potential Improvement Place sticky note comments here
Speed control measures (such as speed humps,
striping, or signage)
•Potential benefits:
▪ More comfortable biking/rolling environment
▪ Reduced use of street for non-local “cut
through” trips
• Potential tradeoffs:
▪ Potential shift of some automobile trips to other
streets
▪ Minor construction period (typically <1 year)
Prioritize biking/rolling at uncontrolled crossings of
busy streets by adding/relocating four-way stops or
other controls
• Potential benefits:
▪ More comfortable biking/rolling environment
▪ Improved ability to cross busy streets when
biking/rolling
• Potential tradeoffs:
▪ Potential change in four-way stop locations (e.g.
moving Washington/Stannage four-way stop to
Washington/Kains)
▪ Minor construction period (typically <1 year)
Traffic diversion to limit automobile traffic volumes
• Potential benefits:
▪ More comfortable biking/rolling environment
▪ Reduced use of street for non-local “cut
through” trips
• Potential tradeoffs:
▪ Circuitous travel for some automobile trips
▪ Potential shift of some automobile trips to
▪ other streets
▪ Minor construction period (typically <1 year)
Other (explain)
Example: Portland Ave, Washington Ave Considerations:
•Traffic volumes and speeds are higher than ideal •Identified
need for a high-comfort, east-west bicycle route on Portland
Ave and/or Washington Ave
▪ 1-2 year construction period
Example: Key Route Blvd
Considerations:
•High volumes of school pick-up and drop-off traffic around
Albany High •Median currently used by students and residents
as green space •Connectivity to bicycle lanes in El Cerrito
Potential Improvement Place sticky note comments here Potential Improvement Place sticky note comments here
Bicycle boulevard on Washington Ave with traffic calm-
ing & vehicle restrictions; no substantial change on
Portland Ave
•Potential benefits:
▪ More comfortable biking/rolling environment on
Washington Ave, but without physical separation
from automobiles
▪ Reduced use of street for non-local “cut through”
trips
•Potential tradeoffs:
▪ Potential shift of some automobile trips to other
streets
Two-way protected cycle track adjacent to street
median
•Potential benefits:
▪ More protection from automobiles for people
biking and rolling
▪ Extends Ohlone Greenway-style facility north
along Key Route
•Potential tradeoffs:
▪ Some reduction in on-street parking
▪ 1-2 year construction period
One-way protected bicycle lanes in each direction
•Potential benefits:
▪ More protection from automobiles for people
biking and rolling
•Potential tradeoffs:
▪ Significant reduction in on-street parking
▪ 1-2 year construction period
Protected biking/rolling facility on Washington Ave
including protected intersections; no substantial
change on Portland Ave
•Potential benefits:
▪ More comfortable biking/rolling environment
on Washington Ave via physical separation
•Potential tradeoffs:
▪ Significant reduction in on-street parking on
Washington Ave
▪ 1-2 year construction period
Median shared-use path
•Potential benefits:
▪ No impact to on-street parking
▪ More protection from automobiles for people
biking and rolling
•Potential tradeoffs:
▪ Reduction in grassy median space
▪ 1-2 year construction periodBiking/rolling facilities on both Washington Ave &
Portland Ave, with one as a bicycle boulevard & the
other as a protected facility
•Potential benefits:
▪ More comfortable biking/rolling environment on
both streets
•Potential tradeoffs:
▪ Potential shift of some automobile trips from the
street with the bicycle boulevard to other streets
▪ Significant reduction in parking on the street
with protected facility
▪ 1-2 year construction period
Striped, buffered bicycle lanes in each direction
•Potential benefits:
▪ Minimal construction period
•Potential tradeoffs:
▪ Significant reduction in on-street parking
▪ Less protection from automobiles for people
biking and rolling
Other (explain)
Other (explain)
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 45
Albany Active Transportation Plan
Pedestrian/Walking Priority Network
Are there other pedestrian facility gaps you would recommend adding?
Pedestrian/Walking Priority Network
Place sticky note comments here or on the map
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 46
Albany Active Transportation Plan
Pedestrian/Walking Priority Network
Are there corridors that should be added to/removed from the Pedestrian/Walking priority network?
Pedestrian/Walking Network Gaps
Place sticky note comments here or on the map
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 47
Albany Active Transportation Plan
Biking/Rolling Network
Are there corridors that should be added to/removed from the Biking/Rolling Network?
Biking/Rolling Priority Network
Place sticky note comments here or on the map
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 48
Corridor Type #4: Major Arterial Corridor Type #5: Ohlone Greenway Corridor Type #6: Solano Avenue
Some potential improvements for this corridor type are listed below, including likely benefits and tradeoffs. Which improvements, if any, would you prefer?
Example: Marin Ave
Considerations:
•Highest traffic volumes and speeds •Designated as a regional
All Ages and Abilities bicycle route
Considerations:
•Used by people traveling at different speeds (e-bikes, reg-
ular bikes, and pedestrians)
• Safety challenges at intersections, where there are
conflicts with vehicle traffic
Potential Improvement Place sticky note comments here
Widen existing path to accommodate more &
different types of users•Potential benefits:
▪ Accommodates more users while separating
different modes/speeds
• Potential tradeoffs:
▪ Reduction in green space near path
▪ 1-2 year construction period
Improve separate path for pedestrians/walking
alongside the existing path•Potential benefits:
▪ Accommodates more users while separating
▪ biking/rolling and pedestrians/walking
• Potential tradeoffs:
▪ Does not increase capacity of shared-use path
▪ 1-2 year construction period
Prioritize greenspace and amenities near the existing
path, and focus on improving Masonic Ave for faster
users
• Potential benefits:
▪ Minimal construction period near existing path
• Potential tradeoffs:
▪ Does not increase capacity of existing path
Other (explain)
Considerations:
• Multiple intersections identified as collision hotspots
• Higher pedestrian volumes due to commercial destinations
• No separated biking/rolling facility
• Need to accommodate commercial activity, including deliveries and parking
• Transit corridor
Potential Improvement Place sticky note comments here
Protected bike lane uphill (eastbound), shared bike/vehicle
lane downhill (westbound)
• Potential benefits:▪ More protection from automobiles for biking/rolling
uphill (eastbound) ▪ Preservation of angled parking on north side of street
• Potential tradeoffs:▪ Less protection from automobiles for biking/rolling
downhill (westbound) ▪ Slight reduction in parking on south side of street via
conversion from angled to parallel parking▪ Asymmetrical street design (different bicycle facilities,
parking configurations, and lane widths on each side)▪ 1-2 year construction period
Shared bike/vehicle lanes, conversion to parallel parking
on one side of the street, and widened sidewalks in both directions• Potential benefits:▪ More space for pedestrians and “placemaking”
amenities like street furniture, art, lighting, and landscaping • Potential tradeoffs:▪ Less protection from automobiles for biking/rolling▪ Slight reduction in parking via conversion from angled to parallel parking on one side of the street▪ 1-2 year construction period
Shared bike/vehicle lanes in both directions (similar to
existing conditions) with crossing enhancements & improved
connections from other biking/rolling facilities• Potential
benefits:▪ Preservation of angled parking on both sides of street▪ Flexibility in phasing improvements
• Potential tradeoffs:▪ Less protection from automobiles for biking/rolling▪ Minimal construction period for shared vehicle/bike ▪ lanes; 1-2 year construction period for larger crossing
enhancements/connections
Other (explain)
(Alameda CTC)
•Multiple intersections identified as collision hotspots
Potential Improvement Place sticky note comments here
One-way parking-protected bicycle lanes in each
direction
•Potential benefits:
▪ Protection from automobiles for people biking
and rolling
•Potential tradeoffs:
▪ 1-2 year construction period
Two-way protected cycle track on south side of
street
•Potential benefits:
▪ Protection from automobiles for people biking
and rolling
▪ Strong connections to south side of street in-
cluding Buchanan St path & Marin Elementary
•Potential tradeoffs:
▪ 1-2 year construction period
Two-way protected cycle track on north side of
street
•Potential benefits:
▪ Protection from automobiles for people biking
and rolling
▪ Strong connections to north side of street in-
cluding Community Center, Solano Ave & Cor
nell Elementary
•Potential tradeoffs:
▪ 1-2 year construction period
Other (explain)
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 49
Biking/Rolling Network
Are there corridors that should be added to/removed from the Biking/Rolling Network?
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 50
Pedestrian/Walking Priority Network
Are there other pedestrian facility gaps you would recommend adding?
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 51
OPEN HOUSE PHOTOS
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 52
PHASE 3 ENGAGEMENT:
PROJECT AND PROGRAM
PRIORITIZATION
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 53
Phase 3 Engagement: Project & Program
Prioritization
Engagement during Phase 3 focused on prioritizing specific projects and programs.
Engagement Activities
Phase 3 engagement activities included:
• Technical Advisory Committee (TAC): December 18, 2025
• Community Meeting: January 22, 2026
• Online Comment Period: January 2026 to February 2026
• Transportation Commission: February 26, 2026
• City Council: April 20, 2026
Summary of Prioritization Results
The charts on the following pages show the results of the community survey conducted during the in-person meeting and online
comment period for pedestrian and trail projects, biking and rolling projects, and active transportation programs. While these
results can be helpful indicators alongside other criteria, it is important to note that they have small sample sizes (under 600
responses to each question) and do not constitute a scientific sample of Albany residents and stakeholders.
The prioritization charts are followed by samples of collateral materials from the engagement activities.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 54
Community Votes on Priorities for Pedestrian & Trail Projects
66
44 41
29 27
24 22 21 20 20
0
10
20
30
40
50
60
70
To
p
3
V
o
t
e
s
Sum of Top 3 Community Votes, Pedestrian & Trail Projects
Rank 1 Rank 2 Rank 3
n = 588
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 55
Community Votes on Priorities for Biking & Rolling Projects
95
54
40 39
26 25 23 22 20 19
0
10
20
30
40
50
60
70
80
90
100
To
p
3
V
o
t
e
s
Sum of Top 3 Community Votes, Biking & Rolling Projects
Rank 1 Rank 2 Rank 3 Total
n = 535
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 56
Community Votes on Priorities for Programs
111
96
62
43
27 27 26 24 18 15
0
20
40
60
80
100
120
To
p
3
V
o
t
e
s
Sum of Top 3 Community Votes: Programs
Rank 1 Rank 2 Rank 3
n = 167
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 57
Prefer to provide
input online?
Scan the QR code to access the digital survey, or go to
https://bit.ly/albany-atp-phase3-survey.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 58
Accomplishments Since 2020 & Projects Underway
Over the past five years, the City of Albany has made significant progress on transportation improvements, and there are
more projects currently underway that have secured funding. The Active Transportation Plan will build on this work.
BERKELEY
EL CERRITORICHMOND
·123
%&580
!"80
ALBANY
CHILDREN'S
CENTER
ALBANY
HIGH
CORNELL
ELEMENTARY
ALBANY
MIDDLE
MARIN
ELEMENTARY
OCEAN VIEW
ELEMENTARY
SAINT MARY'S
COLLEGE HIGH
Albany
Hill Park
Oh
l
o
n
e
G
r
e
e
n
w
a
y
Albany
State Marine
Reserve
Terrace Park
Bay Trail
Albany
Memorial
Park
University
Park
Ocean
View Park
Pierce
Street
Park
Tot Lot
GOLDEN GATE
FIELDS
UNIVERSITY
VILLAGE
ALBANY
CITY HALL
ALBANY
LIBRARY/
COMMUNITY
CENTER
BERKELEY
EL CERRITORICHMOND
Sonoma
A
v
e
Clay St
Francis S
t
Brighton Av
e
Washington Ave
Pi
e
r
c
e
S
t
Dartmouth
S
t
Garfield A
v
e
Portland Ave
Po
l
k
S
t
Ne
i
l
s
o
n
S
t
Monroe St
St
a
n
n
a
g
e
A
v
e
Posen
A
v
e
Po
m
o
n
a
A
v
e
Ma
d
i
s
o
n
S
t
Pe
r
a
l
t
a
A
v
e
Fi
l
l
m
o
r
e
S
t
Ma
s
o
n
i
c
A
v
e
Co
r
n
e
l
l
A
v
e
Ka
i
n
s
A
v
e
Or
d
w
a
y
S
t
Ca
r
m
e
l
A
v
e
Ja
c
k
s
o
n
S
t
Sa
n
t
a
F
e
A
v
e
Ev
e
l
y
n
A
v
e
Ra
m
o
n
a
A
v
e
Sp
o
k
a
n
e
A
v
e
Ea
s
t
s
h
o
r
e
H
w
y
Cl
e
v
e
l
a
n
d
A
v
e
Solano Ave
Buchanan St
Marin Ave
Sa
n
P
a
b
l
o
A
v
e
Cu
r
t
i
s
S
t
Ke
y
R
o
u
t
e
B
l
v
d
Ad
a
m
s
S
t
Washington
A
v
e
Ta
l
b
o
t
A
v
e
Solano Ave
As
h
b
u
r
y
A
v
e
Gilman St
Ea
s
t
s
h
o
r
e
H
w
y
Gilman St
Six
t
h
S
t
Sa
n
t
a
F
e
A
v
e
Central Ave
Fairmou
n
t
A
v
e
Central A
v
e
Colu
s
a
A
v
e
MontereyAve
Hopki
n
s
S
t
CoventryRd
Sa
n
t
a
F
e
A
v
e
MarinAve
CarlsonBlvd
Be
r
k
e
l
e
y
P
a
r
k
B
l
v
d
0.2 Miles
Completed Projects
Albany Beach Trail (2020, by East
Bay Regional Parks District)
Talbot Pedestrian Beacon (2020)
Albany Hill Access
Improvements (2020)
Washington Avenue Access
and Traffic Calming (2020)
ATP Signage and Striping (2022)
Kains and Adams Bikeway Pilot
(2023) and Evaluation (2024)
Marin Avenue Pavement
Project Phase 1 (2023)
Ohlone Greenway Signalized
Intersection Improvements (2024)
Codornices Creek Path,
8th to 10th (2024)
Jackson Street Bikeway Phase 1 (2024)
Funded Projects Underway
San Pablo Pedestrian Improvements
Marin Pavement & Curb
Ramp Rehabilitation
Cleveland Avenue Pavement
Rehabilitation and Bikeway
Shared Use Path Renewal
Jackson Bikeway Phase 2
Critical Intersection Lighting Upgrades
San Pablo Avenue Parallel Bike
Improvements (by Alameda CTC)
San Pablo Avenue Safety
Enhancements (by Alameda CTC)
1
1
2
2
9
9
10
3
3
4
6
6
5
5
5
5
5
55
5
6
7
7
8
8
814
14
14
13
12
16
16 16 16 16
16
1917
1917
1918
1918
1918
1918
15
14
13
12
16
1917
1918
1911
1911
1911
1911
1911
1918
4
10
15
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 59
Prioritizing Pedestrian & Trail Projects
Pedestrian and trail projects are projects that make it safer and more comfortable to walk
or use a mobility device in Albany. This includes projects that improve sidewalks, pedestrian
crossings, and staircases, as well as shared-use trails that may also be used by bicyclists.
BERKELEY
EL CERRITORICHMOND
·123
%&580
!"80
ALBANY
CHILDREN'S
CENTER
ALBANY
HIGH
CORNELL
ELEMENTARY
ALBANY
MIDDLE
MARIN
ELEMENTARY
OCEAN VIEW
ELEMENTARY
SAINT MARY'S
COLLEGE HIGH
Albany
Hill Park
Oh
l
o
n
e
G
r
e
e
n
w
a
y
Albany
State Marine
Reserve
Terrace Park
Bay Trail
Albany
Memorial
Park
University
Park
Ocean
View Park
Pierce
Street
Park
Tot Lot
GOLDEN GATE
FIELDS
UNIVERSITY
VILLAGE
ALBANY
CITY HALL
ALBANY
LIBRARY/
COMMUNITY
CENTER
BERKELEY
EL CERRITORICHMOND
Sonoma
A
v
e
Clay St
Francis S
t
Brighton Av
e
Washington Ave
Pi
e
r
c
e
S
t
Dartmouth
S
t
Garfield A
v
e
Portland Ave
Po
l
k
S
t
Ne
i
l
s
o
n
S
t
Monroe St
St
a
n
n
a
g
e
A
v
e
Posen
A
v
e
Po
m
o
n
a
A
v
e
Ma
d
i
s
o
n
S
t
Pe
r
a
l
t
a
A
v
e
Fi
l
l
m
o
r
e
S
t
Ma
s
o
n
i
c
A
v
e
Co
r
n
e
l
l
A
v
e
Ka
i
n
s
A
v
e
Or
d
w
a
y
S
t
Ca
r
m
e
l
A
v
e
Ja
c
k
s
o
n
S
t
Sa
n
t
a
F
e
A
v
e
Ev
e
l
y
n
A
v
e
Ra
m
o
n
a
A
v
e
Sp
o
k
a
n
e
A
v
e
Ea
s
t
s
h
o
r
e
H
w
y
Cl
e
v
e
l
a
n
d
A
v
e
Solano Ave
Buchanan St
Marin Ave
Sa
n
P
a
b
l
o
A
v
e
Cu
r
t
i
s
S
t
Ke
y
R
o
u
t
e
B
l
v
d
Ad
a
m
s
S
t
Washington
A
v
e
Ta
l
b
o
t
A
v
e
Central Ave
Solano Ave
As
h
b
u
r
y
A
v
e
Gilman St
Gilman St
Ea
s
t
s
h
o
r
e
H
w
y
Six
t
h
S
t
Sa
n
t
a
F
e
A
v
e
Fairmou
n
t
A
v
e
Stratfo
r
d
R
d
MontereyAve
Colu
s
a
A
v
e
Hopk
i
n
s
S
t
Co
l
u
s
a
A
v
e
CoventryRd
Ric
h
m
o
n
d
S
t
Sa
n
t
a
F
e
A
v
e
MarinAve
CarlsonBlvd
Be
r
k
e
l
e
y
P
a
r
k
B
l
v
d
0.2 Miles
Proposed Pedestrian & Trail Projects
Please share additional
thoughts you have about
the proposed pedestrian &
trail projects. Are there any
projects we’re missing?
Place your sticky notes here.
Which pedestrian & trail
projects should the City
prioritize? Vote for your
top three!
Refer to the paper survey to
learn more about each project
and tell us what you think.
1
2
3
4
5
6
10
11
12
13
33 33
34
34 34 34
14
15
16 17
18 19
20
21
22
23
24
25
26
27
28
30 30
31
31
31
7
8
9
1. Bay Trail
2. Cleveland
Ave Pedestrian
Corridor
3. Pierce St
North Pedestrian
Corridor
5. Cleveland-
Pierce Path
4. Pierce St South
Pedestrian Corridor
6. Washington Ave
Pedestrian Corridor
16. Solano Ave
West Pedestrian
Corridor
17. Lower Solano
Ave Pedestrian
Corridor
7. Hillside
Ave Sidewalk
8. Clay Path
Connection
12. Brighton
St Pedestrian
Corridor
29. Cerrito
Creek Pedestrian
Connection
13. Talbot Ave
Pedestrian
Corridor
14. Ohlone
Greenway
21. Thousand Oaks
Blvd Sidewalk
22. Santa Fe Ave
Pedestrian Corridor
15. Portland Ave
Pedestrian Corridor
18 & 19. Upper Solano Avenue
ADA Curb Ramp Improvement
Project & Streetscape
Improvement Project
20. Key Route
Blvd Pedestrian
Corridor
27. Dartmouth
St-Francis St
Pedestrian
Corridor
28. Posen Ave
Pedestrian Corridor
30. Ocean View
Elementary School
Access Improvements
32. Cornell
Elementary School
Access Improvements
33. Albany Middle School
Access Improvements
34. Albany High School
Access Improvements
31. Marin Elementary
School Access Improvements
26. Sonoma Ave
Pedestrian Corridor
25. Peralta Ave
Pedestrian Corridor
24. Upper
Marin Ave
Pedestrian
Corridor
23. Lower Marin
Ave Pedestrian
Corridor
9. Jackson St North
Pedestrian Corridor
10. Buchanan Complete
Streets Improvements 11. Village
Creek Path
32 32
29
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 60
Prioritizing Biking & Rolling Projects
Biking and rolling projects are projects that make it safer and more comfortable to ride a bike, scooter,
or other micromobility device in Albany. This includes projects that implement bicycle boulevards,
separated bike lanes, striped/buffered bike lanes, traffic calming, and intersection improvements.
BERKELEY
EL CERRITORICHMOND
·123
%&580
!"80
ALBANY
CHILDREN'S
CENTER
ALBANY
HIGH
CORNELL
ELEMENTARY
ALBANY
MIDDLE
MARIN
ELEMENTARY
OCEAN VIEW
ELEMENTARY
SAINT MARY'S
COLLEGE HIGH
Albany
Hill Park
Oh
l
o
n
e
G
r
e
e
n
w
a
y
Albany
State Marine
Reserve
Terrace Park
Bay Trail
Albany
Memorial
Park
University
Park
Ocean
View Park
Pierce
Street
Park
Tot Lot
GOLDEN GATE
FIELDS
UNIVERSITY
VILLAGE
ALBANY
CITY HALL
ALBANY
LIBRARY/
COMMUNITY
CENTER
BERKELEY
EL CERRITORICHMOND
Sonoma
A
v
e
Clay St
Francis S
t
Brighton Av
e
Washington Ave
Pi
e
r
c
e
S
t
Dartmouth
S
t
Garfield A
v
e
Portland Ave
Po
l
k
S
t
Ne
i
l
s
o
n
S
t
Monroe St
St
a
n
n
a
g
e
A
v
e
Posen
A
v
e
Po
m
o
n
a
A
v
e
Ma
d
i
s
o
n
S
t
Pe
r
a
l
t
a
A
v
e
Fi
l
l
m
o
r
e
S
t
Ma
s
o
n
i
c
A
v
e
Co
r
n
e
l
l
A
v
e
Ka
i
n
s
A
v
e
Or
d
w
a
y
S
t
Ca
r
m
e
l
A
v
e
Ja
c
k
s
o
n
S
t
Sa
n
t
a
F
e
A
v
e
Ev
e
l
y
n
A
v
e
Ra
m
o
n
a
A
v
e
Sp
o
k
a
n
e
A
v
e
Ea
s
t
s
h
o
r
e
H
w
y
Cl
e
v
e
l
a
n
d
A
v
e
Solano Ave
Buchanan St
Marin Ave
Sa
n
P
a
b
l
o
A
v
e
Cu
r
t
i
s
S
t
Ke
y
R
o
u
t
e
B
l
v
d
Ad
a
m
s
S
t
Washington
A
v
e
Ta
l
b
o
t
A
v
e
Central Ave
Solano Ave
As
h
b
u
r
y
A
v
e
Gilman St
Gilman St
Ea
s
t
s
h
o
r
e
H
w
y
Six
t
h
S
t
Sa
n
t
a
F
e
A
v
e
Fairmou
n
t
A
v
e
Stratfo
r
d
R
d
MontereyAve
Colu
s
a
A
v
e
Hopk
i
n
s
S
t
Co
l
u
s
a
A
v
e
CoventryRd
Ric
h
m
o
n
d
S
t
Sa
n
t
a
F
e
A
v
e
MarinAve
CarlsonBlvd
Be
r
k
e
l
e
y
P
a
r
k
B
l
v
d
0.2 Miles
Proposed Biking & Rolling Projects Which biking & rolling
projects should the City
prioritize? Vote for your
top three!
Refer to the paper survey to
learn more about each project
and tell us what you think.13. Brighton
Ave Bikeway
7
6
8
9
10
5
1
2
13
14
18
17
21
22
23
19
20
16
25
4
27
26
28
15
3
11
24
12
2. Adams-
Clay Bikeway
3. San Pablo
Ave Bikeway
11. Kains
Ave Bikeway
24. Lower Marin
Ave Bikeway
5. Jackson-Adams
Bikeway Connection
8. Buchanan-Eastshore
Undercrossing
10. Jackson St
South Bikeway
9. Eastshore
Hwy Bikeway
6. Cleveland
Ave Bikeway
15. Lower
Solano Bikeway
4. San Pablo Ave
Cycle Track &
Marin Intersection
27. Dartmouth
St-Francis St
Bikeway
28. Posen
Ave Bikeway
26. Peralta
Ave Bikeway
22. Santa Fe Ave
Traffic Calming
19. Portland
Ave Bikeway
16. Upper Solano
Avenue Streetscape
Improvement Project
7. Jackson St
North Bikeway
12. Talbot
Ave Bikeway
1. Adams-Carlson
Bikeway Connection
18. Key Route
Blvd Bikeway
23. Curtis
St Bikeway
14. Masonic
Ave Bikeway
17. Spokane-
Behrens Bikeway
Connection
21. Carmel
Ave Bikeway
20. Washington
Ave Bikeway
25. Upper
Marin Ave
Bikeway
Please share additional
thoughts you have about
the proposed biking &
rolling projects. Are there
any projects we’re missing?
Place your sticky notes here.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 61
Weighing Project Tradeoffs
Every project has tradeoffs that the City of Albany has to carefully weigh. Different streets serve different
purposes, which informs which tradeoffs are worth making on each street. Resources are also limited, so the
City needs your help prioritizing which streets and intersections receive certain improvements!
Where do you want to prioritize high-impact treatments, even if it impacts parking or traffic?
Place stickers on the map that correspond with the treatments on the left.
Are there any other improvements you want to see?
Place your sticky notes here.
Projects can include high-impact
improvements that make it
comfortable for people of all ages
and abilities to walk, bike, and roll.
However, these projects can be costly
and result in substantial impacts to
vehicle traffic and parking.
High-Impact Treatments
ALBANY
CHILDREN'S
CENTER
ALBANY
HIGH
CORNELL
ELEMENTARY
ALBANY
MIDDLE
MARIN
ELEMENTARY
OCEAN VIEW
ELEMENTARY
SAINT MARY'S
COLLEGE HIGH
UNIVERSITY
VILLAGE
ALBANY
CITY HALL
ALBANY
LIBRARY/
COMMUNITY
CENTER
BERKELEY
EL CERRITORICHMOND
·123
%&580
!"80
Albany
Hill Park
Oh
l
o
n
e
G
r
e
e
n
w
a
y
Albany
State Marine
Reserve
Terrace Park
Bay Trail
Albany
Memorial
Park
University
Park
Ocean
View Park
Pierce
Street
Park
Tot Lot
GOLDEN GATE
FIELDS
BERKELEY
EL CERRITORICHMOND
Sonoma
A
v
e
Clay St
Francis S
t
Brighton Av
e
Washington Ave
Pi
e
r
c
e
S
t
Dartmouth
S
t
Garfield A
v
e
Portland Ave
Po
l
k
S
t
Ne
i
l
s
o
n
S
t
Monroe St
St
a
n
n
a
g
e
A
v
e
Posen
A
v
e
Po
m
o
n
a
A
v
e
Ma
d
i
s
o
n
S
t
Pe
r
a
l
t
a
A
v
e
Fi
l
l
m
o
r
e
S
t
Ma
s
o
n
i
c
A
v
e
Co
r
n
e
l
l
A
v
e
Ka
i
n
s
A
v
e
Or
d
w
a
y
S
t
Ca
r
m
e
l
A
v
e
Ja
c
k
s
o
n
S
t
Sa
n
t
a
F
e
A
v
e
Ev
e
l
y
n
A
v
e
Ra
m
o
n
a
A
v
e
Sp
o
k
a
n
e
A
v
e
Ea
s
t
s
h
o
r
e
H
w
y
Cl
e
v
e
l
a
n
d
A
v
e
Solano Ave
Buchanan St
Marin Ave
Sa
n
P
a
b
l
o
A
v
e
Cu
r
t
i
s
S
t
Ke
y
R
o
u
t
e
B
l
v
d
Ad
a
m
s
S
t
Washington
A
v
e
Ta
l
b
o
t
A
v
e
Solano Ave
Gilman St
Six
t
h
S
t
Sa
n
t
a
F
e
A
v
e
MontereyAve
Central Ave
Fairmou
n
t
A
v
e
Colu
s
a
A
v
e
Hopki
n
s
S
t
Sa
n
t
a
F
e
A
v
e
Marin Ave
Be
r
k
e
l
e
y
P
a
r
k
B
l
v
d
Ea
s
t
s
h
o
r
e
H
w
y
CarlsonBlvd
AshburyAve
Proposed Projects 0.2 Miles
Benefit: Reduces cut-through traffic and
motor vehicle speeds, making it safer
for people walking, biking, and rolling.
Impact: Reduces access
for motor vehicles.
Traffic calming and diversion
Benefit: Creates a more comfortable and
enjoyable experience for people walking,
and can include added landscaping.
Impact: Reduces room for parking.
In some cases, widening requires
paving over existing landscaping.
Widened sidewalks
Benefit: Physically separates people biking
and rolling from motor vehicle traffic,
improving safety for all ages and abilities.
Impact: Reduces room for on-
street parking and travel lanes.
Protected bikeways
Place your sticky notes
here to elaborate on
your priorities.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 62
COST:
BENEFIT:
Low High
Prioritizing Active Transportation Programs & Policies
In addition to on-the-ground projects, the Active Transportation Plan includes programs and policies that will help further the Plan’s
four goals of Access & Connectivity, Safety & Comfort, Equitable Outcomes, and Implementation & Funding. These include actions
that will be implemented as part of staff workplans, such as education and outreach, maintenance, and citywide upgrades.
Which programs and policies should the City prioritize? Vote for your top three!
Fill out the paper survey to tell us what you think.
The City estimated each program and
policy’s magnitude of cost (funding and
staff time) and the magnitude of benefit it
would provide to active transportation.
Transportation Demand
Management
Identify and implement transportation
demand management strategies to support
mode shift with new development.
COST: BENEFIT:
Navigation & Wayfinding
Improve navigation and wayfinding resources,
including physical signage and online resources.
COST: BENEFIT:
Educational Programs
Continue to support traffic-safety educational
programs, including existing partnerships with
Alameda County, AUSD, and other stakeholders.
COST: BENEFIT:
Speed Management &
Enforcement
Update the traffic calming and speed management
program to implement improvements
proactively through an evaluation process.
COST: BENEFIT:
Bikeshare & Micromobility
Implement a bikesharing or micromobility
program, including potential partnerships with
regional or neighboring jurisdictions.
COST: BENEFIT:
Accessibility Upgrades
Continue ongoing ADA program upgrades.
COST: BENEFIT:
Traffic Safety Program
Establish dedicated traffic safety funding, distinct
from maintenance and capital project funding,
to address traffic safety issues based on regular
collision safety analysis and monitoring.
COST: BENEFIT:
Pedestrian Visibility
Maintain clear visibility at intersections and
driveways through installation of raised
elements (curbs, posts, bumps) in high-activity
areas to ensure adequate sightlines.
COST: BENEFIT:
Reduce Posted Speed Limits
Conduct a citywide speed study and evaluate potential
speed limit reductions permitted under recent state law.
COST: BENEFIT:
Lighting
Continue to implement recommendations of the
City of Albany Street Lighting Evaluation (2024).
COST: BENEFIT:
Bike Parking
Install additional bike parking at high-
activity locations citywide.
COST: BENEFIT:
Intersection Treatment
Guidelines
Develop programmatic guidelines for the
implementation of intersection treatments
including “No Right on Red” restrictions.
COST: BENEFIT:
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 63
CITY OF ALBANY
Active Transportation Plan Survey
CONTACT INFO (OPTIONAL)
Name: __________________________________________________
Email: __________________________________________________
Which bike & rolling projects should the City prioritize? Vote for your top three!
Vote
here!ID Project Description Status
1 Adams-Carlson Bikeway
Connection
Biking/rolling connection across Cerrito Creek
connecting to Carlson St in El Cerrito
Planning
2 Adams-Clay Bikeway One-way motor vehicle traffic, contraflow bike lane Design
3 San Pablo Ave Bikeway Long-term vision for separated bikeway
along extent of San Pablo Avenue
Initiation
4 San Pablo Ave Cycle Track
& Marin Intersection
Extension of two-way cycle track along San
Pablo from Sprouts to Marin, intersection
improvements at San Pablo/Marin
Design
5 Jackson-Adams Bikeway
Connection
Two-way separated bikeway along Buchanan
between Jackson and Adams
Planning
6 Cleveland Ave Bikeway Two-way separated bikeway OR striped bike lane Initiation
7 Jackson St North Bikeway Bike boulevard treatments; potential
northbound bike lane (Solano to Buchanan)
Initiation
8 Buchanan-Eastshore
Undercrossing
Improved connection between Buchanan
path and Eastshore (e.g. lighting, motor
vehicle access restrictions, wayfinding)
Design
9 Eastshore Hwy Bikeway Separated bikeway OR striped bike lanes Initiation
10 Jackson St South Bikeway
Two-way separated bikeway along Jackson
St, providing connections to Codornices
Creek Path and Berkeley bike network
Initiation
11 Kains Ave Bikeway One-way motor vehicle traffic, contraflow bike lane Design
12 Talbot Ave Bikeway
Contraflow bike lane (North of Brighton); school-
time traffic restrictions OR other circulation
changes (between Solano and Marin)
Initiation
13 Brighton Ave Bikeway Separated bikeway OR striped/buffered bike lanes Initiation
Inte
r
s
e
c
t
i
o
n
Imp
r
o
v
e
m
e
n
t
s
Imp
r
o
v
e
d
S
c
h
o
o
l
Con
n
e
c
t
i
o
n
Pote
n
t
i
a
l
P
a
r
k
i
n
g
Imp
a
c
t
s
Pote
n
t
i
a
l
T
r
a
f
f
i
c
Dive
r
s
i
o
n
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 64
Vote
here!ID Project Description Status
14 Masonic Ave Bikeway
Separated bikeway OR striped/buffered
bike lanes in relation to improvements to
Ohlone Greenway separation of users
Initiation
15 Lower Solano Bikeway
Eastbound/uphill protected bikeway, westbound/
downhill shared lane with parking converted to
parallel, intersection improvement at Solano/Talbot
Initiation
16
Upper Solano
Avenue Streetscape
Improvement Project
Streetscape improvement project (including pavement,
drainage, lighting, green infrastructure), eastbound/
uphill separated bikeway, westbound/downhill
shared lane with parking converted to parallel
Planning
17 Spokane-Behrens
Bikeway Connection
Biking/rolling connection between Spokane and
Behrens St (in coordination with El Cerrito)
Initiation
18 Key Route Blvd Bikeway Separated bikeway OR striped/buffered
bike lanes OR median path
Planning
19 Portland Ave Bikeway
Bike boulevard treatments OR separated bikeway
OR striped/buffered bike lanes, intersection
improvements at Portland/Kains and Portland/Curtis
Initiation
20 Washington Ave Bikeway
Bike boulevard treatments OR separated
bikeway OR striped/buffered bike lanes;
intersection improvements at Washington/Adams,
Washington/Kains, and Washington/Curtis
Initiation
21 Carmel Ave Bikeway Bike boulevard treatments Initiation
22 Santa Fe Ave Traffic Calming Traffic calming, intersection improvements Funding
23 Curtis St Bikeway Bike boulevard treatments Initiation
24 Lower Marin Ave Bikeway Separated bikeway; intersection improvements
at Marin/San Pablo and Marin/Talbot
Initiation
25 Upper Marin Ave Bikeway Separated bikeway; intersection
improvements at Marin/Curtis
Initiation
26 Peralta Ave Bikeway
Traffic calming for shared facility; separated bikeway
OR striped bike lanes between Francis & Posen with
intersection improvements at Peralta/Posen
Initiation
27 Dartmouth St-Francis
St Bikeway Bike boulevard treatments Initiation
28 Posen Ave Bikeway Traffic calming to limit vehicle speeds; coordinate
with Berkeley on facility connections
Initiation
Inte
r
s
e
c
t
i
o
n
Imp
r
o
v
e
m
e
n
t
s
Imp
r
o
v
e
d
S
c
h
o
o
l
Con
n
e
c
t
i
o
n
Pote
n
t
i
a
l
P
a
r
k
i
n
g
Imp
a
c
t
s
Pote
n
t
i
a
l
T
r
a
f
f
i
c
Dive
r
s
i
o
n
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 65
Which pedestrian & trail projects should the City prioritize? Vote for your top three!
Vote
here!ID Project Description Status
1 Bay Trail Improve trail junctions at Albany Bulb entrance
and I-580 off-ramp intersection
Initiation
2 Cleveland Ave
Pedestrian Corridor
Install 5’ sidewalks where missing, address
parking on sidewalk through enforcement
Initiation
3 Pierce St North
Pedestrian Corridor Improve pedestrian access routes and experience Initiation
4 Pierce St South
Pedestrian Corridor
Address parking on sidewalk by establishing new
parking lanes and parking restrictions
Initiation
5 Cleveland-Pierce Path Multi-use path connecting Cleveland Ave
to Pierce St via Pierce St Park
Design
6 Washington Ave
Pedestrian Corridor
Address parking on sidewalk by establishing
new parking lanes and/or restrictions
Initiation
7 Hillside Ave Sidewalk Install 5’ sidewalks where missing Initiation
8 Clay Connection Trail/stairs connecting Jackson to
Madison via public right-of-way
Initiation
9 Jackson St North
Pedestrian Corridor
Improve pedestrian access routes and experience,
particularly near Albany Children’s Center;
crossing improvements at Jackson/Solano
Initiation
10 Buchanan Complete
Streets Improvements
Intersection improvements at Buchanan/Pierce, Buchanan/
Jackson and Buchanan/Taylor; improve pedestrian experience
Planning
11 Village Creek Path Multi-use path connecting Jackson St to existing
path adjacent to Sprouts grocery
Initiation
12 Brighton St Pedestrian Corridor
Improve pedestrian access routes and experience,
particularly on school side; school-time traffic restrictions
OR other circulation changes by Albany Middle School
Initiation
13 Talbot Ave Pedestrian Corridor Intersection improvements at Talbot/Marin and Talbot/
Solano; widen sidewalks and/or loading areas around school
Initiation
Inte
r
s
e
c
t
i
o
n
Imp
r
o
v
e
m
e
n
t
s
Imp
r
o
v
e
d
S
c
h
o
o
l
Con
n
e
c
t
i
o
n
Pote
n
t
i
a
l
P
a
r
k
i
n
g
Imp
a
c
t
s
Pote
n
t
i
a
l
T
r
a
f
f
i
c
Dive
r
s
i
o
n
CITY OF ALBANY
Active Transportation Plan Survey
CONTACT INFO (OPTIONAL)
Name: __________________________________________________
Email: __________________________________________________
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 66
Vote
here!ID Project Description Status
14 Ohlone Greenway
Widen path and better separate modes, combine
with improvements to Masonic Ave, create direct
connection to Albany Middle School
Initiation
15 Portland Ave Pedestrian
Corridor Improve pedestrian access routes and experience Initiation
16 Solano Ave West
Pedestrian Corridor
Intersection improvements at Solano/
Jackson; evaluate potential closure to motor
vehicles between Adams and San Pablo
Initiation
17 Lower Solano Ave
Pedestrian Corridor
Intersection improvements at Solano/
Cornell and Solano/Talbot
Initiation
18 Upper Solano Avenue ADA Curb
Ramp Improvement Project Upgrade curb ramps between Key Route and Tulare Design
19
Upper Solano
Avenue Streetscape
Improvement Project
Streetscape improvement project, eastbound/uphill
protected bikeway, westbound/downhill shared lane with
parking converted to parallel; traffic signal improvements
at Solano/Santa Fe, consider signal at Solano/Peralta
Planning
20 Key Route Blvd
Pedestrian Corridor
Install median stops for cross-streets where missing; mid-
block crossing between street median and High School
for student use; improve pedestrian experience
Planning
21 Thousand Oaks Blvd Sidewalk Install 5’ sidewalks where missing (north side of Memorial Park)Design
22 Santa Fe Ave Pedestrian
Corridor
Intersection improvements at Santa Fe/Key Route and Santa
Fe/Marin; traffic signal improvements at Santa Fe/Solano
Funding
23 Lower Marin Ave
Pedestrian Corridor
Intersection improvements at San Pablo/Marin,
additional intersection improvements at Marin/Talbot
Initiation
24 Upper Marin Ave
Pedestrian Corridor Intersection improvements at Marin/Santa Fe and Marin/Curtis Initiation
25 Peralta Ave Pedestrian Corridor Improve pedestrian access routes and experience;
consider signal at Solano/Peralta
Initiation
26 Sonoma Ave Pedestrian
Corridor Intersection improvements at Sonoma/Curtis Initiation
27 Dartmouth St-Francis
St Corridor
Improve pedestrian access routes and experience,
including short segments on Santa Fe and Pomona
Initiation
28 Posen Ave Pedestrian Corridor Improve pedestrian access routes and experience Initiation
29 Cerrito Creek Pedestrian
Connection
Pedestrian path connecting from Orientation Center path at
Adams to Albany Hill Trails along south side of Cerrito Creek
Initiation
Inte
r
s
e
c
t
i
o
n
Imp
r
o
v
e
m
e
n
t
s
Imp
r
o
v
e
d
S
c
h
o
o
l
Con
n
e
c
t
i
o
n
Pote
n
t
i
a
l
P
a
r
k
i
n
g
Imp
a
c
t
s
Pote
n
t
i
a
l
T
r
a
f
f
i
c
Dive
r
s
i
o
n
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 67
Vote
here!ID Project Description Status
30 Ocean View Elementary
School Access Improvements
Intersection improvements at Buchanan/
Taylor and Buchanan/Jackson
Initiation
31 Marin Elementary School
Access Improvements
Intersection improvements at Marin/Santa Fe, Marin/
Curtis, and Curtis/Sonoma, improve pedestrian experience;
consider vehicle loading and bike/ped school access changes
Initiation
32 Cornell Elementary School
Access Improvements
Intersection improvements at Solano/Talbot
and Solano/Cornell; consider vehicle circulation
and bike/ped school access changes
Initiation
33 Albany Middle School
Access Improvements
Direct bike/ped/ADA connection between the
Ohlone Greenway, Albany Middle Schoool, and
Cougar Field; consider vehicle loading and circulation
changes/restrictions along Brighton and San Gabriel;
intersection improvements at Key Route/Brighton
Initiation
34 Albany High School
Access Improvements
Intersection improvements at Key Route/
Portland, Portland/Ramona, Portland/Pomona, and
Thousand Oaks/Key Route, mid-block pedestrian
crossing and traffic calming along Key Route
Initiation
Which programs and policies should the City prioritize?
Vote for your top three!
Inte
r
s
e
c
t
i
o
n
Imp
r
o
v
e
m
e
n
t
s
Imp
r
o
v
e
d
S
c
h
o
o
l
Con
n
e
c
t
i
o
n
Pote
n
t
i
a
l
P
a
r
k
i
n
g
Imp
a
c
t
s
Pote
n
t
i
a
l
T
r
a
f
f
i
c
Dive
r
s
i
o
n
Vote
here!ID Program
1 Transportation Demand
Management
2 Navigation & Wayfinding
3 Educational Programs
4 Speed Management
& Enforcement
5 Reduce Posted Speed Limits
6 Lighting
Vote
here!ID Program
7 Bike Parking
8 Intersection Treatment
Guidelines
9 Pedestrian Visibility
10 Traffic Safety Program
11 Accessibility Upgrades
12 Bikeshare & Micromobility
Please share additional thoughts you
have about the proposed programs and
policies. Are there any we’re missing?
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 68
7/1/2026
1
Citywide Planning Expo
January 22, 2026
City of Albany Active Transportation Plan (ATP)Watershed Management Plan
ATP Update Process
Engagement Objectives
•Prioritization of pedestrian & trail projects
•Prioritization of biking & rolling projects
•Weighing project tradeoffs
•Prioritization of programs & policies
Next Steps
Active Transportation Plan
1
2
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 69
7/1/2026
2
Phase 1
Goals & Existing
Conditions
Phase 2
Draft Active
Transportation
Networks
Phase 3
Projects &
Priorities
ATP Document
Winter 2024/2025 Spring/Summer/Fall 2025 Winter/Spring 2026
Including next steps for
Solano Ave
ATP Update Process
We are here to solicit community feedback on:
1. Prioritization of pedestrian & trail projects
2. Prioritization of biking & rolling projects
3. Weighing project tradeoffs
4. Prioritization of programs & policies
Engagement Objectives
All feedback can be submitted via paper survey
tonight or online through Sunday, February 16
https://bit.ly/albany-atp-phase3-survey
3
4
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 70
7/1/2026
3
•Continue to collect public feedback
through Sunday Feb 16
•Continue to define, evaluate & prioritize
projects, programs & policies
•Review draft results with:
•Transportation Commission (Feb/Mar)
•City Council (Mar/Apr)
•Develop ATP document
•Visit City Council for review & adoption
(Apr/May)
ATP Next Steps
Watershed Management Plan
5
6
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 71
7/1/2026
4
Thank You
ATP Projects & Priorities Open House
January 22, 2026
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 72
ENGAGEMENT WITH ALBANY
UNIFIED SCHOOL DISTRICT
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 73
Focused Look at Schools
•September 12, 2024 – City staff presents planning effort to AUSD Site Leadership and
discusses strategies for engagement with school community
•May-June, 2025: City staff engaged with Albany Unified School District stakeholders
through a series of engagement meetings discussing key issues of concern and the
active transportation network and potential projects; meetings included one-on-
ones with each principal, two elementary school ‘coffee with a principal’ parent
meetings, and a discussion with AHS Leadership Advisory students
•Specific school access projects developed for Phase 3 project prioritization
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 74
AUSD Site Leadership Meeting
September 12, 2024
City of Albany 2024 Active Transportation Plan
Presentation by Ben Matlaw and Justin Fried
Community Development Department, City of Albany
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 75
Overview
1.What We’re Trying to Do
2.How We’re Going About It
3.How We Can Engage School Communities
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 76
What We’re Trying to Do
Making A Plan
•Serves as pedestrian and bicycle
master plans
•Informs street design, capital project
prioritization, and supportive
policies and programs
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 77
How We’re Going About It
Phase 1
Vision & Goals +
Existing Conditions
Phase 2
Facilities &
Policies
Phase 3
Prioritized
Projects
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 78
How We’re Going About It
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 79
How We’re Going About It
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 80
How We Can Engage School Communities
Technical Advisory Committee meetings
Public workshops/open houses
Transportation Commission meetings
City Council meetings
AUSD-specific events/groups/opportunities
1
2
3
4
5
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 81
Engagement Opportunities Brainstorm
How to best engage the AUSD community in
the Active Transportation Plan?
•Specific communities:
•Faculty
•Staff
•Parents
•Students (elementary, middle, high)
•Affinity groups
•Existing meetings vs. new meetings
•Online vs. in-person
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 82
Thank You!
Ben Matlaw
Associate Transportation Planner
BMatlaw@albanyca.org
510-528-5762
Justin Fried
Transportation & Sustainability Manager
JFried@albanyca.org
510-528-5759
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 83
ATP Phase 2 Feedback – All AUSD Meetings
Ocean View Coffee with a Principal (5.14.25)
Attendees
• Justin Fried, CDD
• Principal Ana Delgado, AUSD
• parents
Conversation
• Focus was on Jackson Street, proposed Jackson Street Bikeway and crosswalk location at
southern end of campus
• Congestion and traffic flow for drop-off and pick-up; ways to move drop-off line quicker and
reduce back-up into Jackson/Buchanan intersection
• Parking reduction of 9 spaces estimated for conversion of angled to parallel
• Any other tools/options to further improve drop-off capacity?
Suggestions/recommendations
• Minimize loss of parking
• General support for moving crosswalk north to southern leg of drop-off lane exit and
Jackson
• Consider stop control or alternatives in terms of maximizing flow of traffic exiting lane
• Consider left-turn exit only so pedestrians in crosswalk do not slow drop-off lane
Meeting with Ocean View Principal Ana Delgado (5.14.25)
Attendees
• Justin Fried, CDD
• Ben Matlaw, CDD
• Principal Ana Delgado, AUSD
• Kim Trutane, AUSD
Conversation
• Focus was on Jackson Street, discussed other safety concerns and general campus access
• Most walkers come from north along Jackson, some but fewer approach along Buchanan
Bikeway from west; UC Village residents primarily walk up along Jackson
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 84
• Most access campus from main entrance of Jackson, kids do not use side entrance / drive
off of Buchanan
• Entering from Ocean View Park allowed but gate not always open
• Any way to improve vehicle circulation, with acknowledgement that Ocean View has more
of a drop-off than other schools and not unique to this school or Albany
Suggestions/recommendations
• Support direction to move crosswalk in design revision for Jackson Street Bikeway; continue
to think about how to best facilitate drop-off lane flow while improving safety and access for
peds/bikes
Cornell Coffee with a Principal (5.16.25)
Attendees
• Justin Fried, CDD
• Principal Cat Floresca, AUSD
• Parents, including Transportation Commissioner Zyba
Conversation
• Congestion at pick-up and drop-off key safety concern
• Parents think they need to walk kids into campus; principal said that is not required and
news to her; discussion of how to change practices
• Crossings at Talbot and Cornell dangerous, cars don’t yield, too busy, lots of near misses
Suggestions/recommendations
• At Talbot and Cornell Solano crossings – make all way stops, add traffic lights, do something
/ more needed to improve drivers yielding to pedestrians crossing
• Successful walking school bus; second one could be formed at the Community Center as
another vehicle kid-drop location if volunteers coordinated to then assist kids getting from
there to the campus
• Encourage driving parents to drop-off and not walk into campus
• Look at changes to kindergarten yard to enable streetside drop-off
• Look at opening second gate to yard on Cornell to increase drop-off options
• Consider formalizing drop-off lane with attendees to ensure kid gets from car to entrance
and parents stay in car and keep line moving; lane lines, posts look at Michelle Obama
school in Richmond; Castro Valley middle school
• Look to formalize parent volunteers for this with PTA – end of July PTA prep meeting for
upcoming school year
• Look to encourage and/or restrict drop-off to single direction on Cornell and Talbot
• Develop circulation/drop-off map; windshield card or handout for parents not complying to
encourage desired flow behavior
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 85
• Review/refresh/increase drop-off zones to support this; start zone behind ramp on Cornell
which also serves as bike access and forces kids to sidewalk sooner when blocked
Meeting with AHS Leadership Advisory Students (5.21.25)
Attendees
• Justin Fried, CDD
• Ben Matlaw, CDD
• Kim Trutane, AUSD
• Michelle Aselstine, AUSD
• Around 30 AHS Leadership Advisory students, including Transportation Commissioner
Julian Baldwin
Conversation
• Key Route/Portland intersection is scary -hard to navigate as a cyclist, cars stuck in
intersection waiting for pedestrians to clear crosswalk
• Insufficient crosswalks crossing Thousand Oaks to AHS/Memorial Park (@ Pomona,
Ramona, Carmel)
• Most traffic comes from parents dropping their kids off at school and student drivers
• Traffic is particularly bad on Key Route between high school and middles school
• Key Route/Brighton is a scary intersection - kids hurrying to cross multiple crosswalks and
lots of vehicles
• After school traffic / back up is due to students crossing the street and drivers trying to turn
at intersections simultaneously
• It’s scary to bike to school when you have to share the road with parents dropping their kids
off
o Parents drop their kids off right in front of school
o Students don’t have an easy way to bike up to the bike racks / bike parking zone
• Most leadership students either drive or walk to school (no one cycles daily)
• Question to students: Why do you travel to school in the mode you do / why don’t you use
other modes?
o Crossing Marin feels scary / dangerous so it’s just easier to drive
o Don’t like crossing Marin and Solano because they’re wide and dangerous to cross
(Key Route/Solano in particular)
o Bike theft is an issue
o Recommendation: More, better, and safer bike parking around the school
o Driving is easiest to maximize time outside of school
o Bags are heavy and difficult to bike with
o Biking is hard if you want to do anything after school, less flexible to do things with
other students
o There are no protected bike facilities in Albany so it’s scary to bike (especially the
Marin/Pomona intersection, along Portland and Washington)
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 86
o Recommendation: If the city/school made drop-off less appealing to parents, they
would encourage their kids to bike or walk to school
• San Pablo/Washington light takes too long to cross
• Peralta is a nice street to walk along
• Middle school has morning classes at high school, and then middle school students have 5
minutes to get from class at high school to class at middle school so they run across Key
Route because they don’t want to be tardy, which is scary/dangerous
Suggestions/recommendations
• Add crossing guards at all intersections around schools
• Add traffic lights or flashing red or something at key intersections to control pedestrian and
traffic flow
• Add a stop control at the Solano/Curtis intersection
• Add an RRFB at Washington/San Pablo
• Brighton/Key Route and Portland/Key route intersections should have an electronic traffic
control (blinking red light?) to make it safer for pedestrians
• Install a midblock crossing connecting AHS to the Key Route median where students eat
lunch
• Better connect key route walking/biking infrastructure to Ohlone Greenway
Meeting with AHS Principal Darren McNalley (5.22.25)
Attendees
• Justin Fried, CDD
• Ben Matlaw, CDD
• Darren McNalley, AUSD
• Kim Trutane, AUSD
Conversation
• Principal McNalley wants to set up a meeting with students with disabilities
o Principal will reach out to students with mobility issues to organize a meeting
• Vast majority of students come from south and east of school
• Some middle school students have classes at AHS and travel between two campuses
• Not a lot of pick-up and drop-off because many kids walk to school
• Key Route/Portland and Key Route/Thousand Oaks get a LOT of pedestrian traffic and see
bike/car collisions
• Emergency service vehicles make emergency visits to AHS every 2-3 weeks (on average)
• Traffic calming is a priority, particularly safe mid-block crossing of Key Route
• Use of Key Route at lunch is a post-COVID phenomenon
• No parking management, parking permits, or priority parking and no parking lot on site for
school staff / visitors
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 87
• 15% of students are not Albany residents (mostly from El Cerrito / Richmond)
• Gets busy outside of school at 8am or 8:15am
• Flow in-out at end of school day is more measured because students / staff don’t leave the
school at the same time
• Portland and Thousand Oaks = overflow parking for staff / students
• Students biking have been hit by cars at Key Route/Thousand Oaks and Portland/Curtis
intersections
• Parking in front of pool is usually occupied so school students and teachers don’t park there
o It also might be time-limited
• City installed no lighting along Key Route (on AHS side)
• Lots of students go to El Cerrito Plaza for lunch
Suggestions/recommendations
• Add midblock crossings on Key Route and Thousand Oaks to high school
o Raised crossings (on both sides of the streets on Key Route)
• Speed humps for NB Key Route along school frontage
• Convert parallel parking to 45 degree angle parking alongside High School on Key Route to
provide more parking
• Improve sidewalk along Thousand Oaks and complete sidewalk on Carmel to create a full
loop around block for PE runs, school, field, and park access
• Install/improve crosswalks along Thousand Oaks (at Ramona, Pomona, and Curtis)
• Improve lighting on Thousand Oaks and Portland (especially on Thousand Oaks, which
provides access to the gym; Key Route lighting was improved recently)
• Improve entire ped connection between high school and middle school
Meeting with AMS Principal Eric Mapes (5.27.25)
Attendees
• Justin Fried, CDD
• Eric Mapes, AUSD
• Kim Trutane, AUSD
Conversation
• Student safety concerns crossing Brighton at Ohlone Greenway/Masonic and at San
Gabriel; drivers get impatient, Principal/staff attempt to do traffic control, pulse crossings
and facilitate cars moving through safely
• Students ride on sidewalk to get to gate or to get to main entrance when gate is closed; not
safe on street
• Lower speed limit? PD support has been great
• What age are helmets required? -> under 18 (CA); riding on sidewalk under 16 ok ‘exercising
due care and giving the pedestrian the right-of-way’ (Albany Municipal Code)
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 88
Suggestions/recommendations
• City/school district conversations on training MS staff on traffic control
• Restrict turning movements at the intersections to make traffic control easier and reduce
number of conflicts
• Maybe westbound only on Brighton, restrict entering eastbound at Masonic during drop-
off/pick-up or during school hours
• Continue work to include bike/ped access to parking lot/bike parking area directly from
Ohlone Greenway and avoid need for Brighton from the west for cyclist access in
conjunction with Cougar Field ADA upgrades
• East of stop at San Gabriel extend drop off zone on north side
• Eliminate drop-off zone on San Gabriel, discourage use of San Gabriel
• Consider other ways to improve compliance at San Gabriel/Brighton where students cross
all day between periods; raised crosswalk?
• Make sure students crossing to/from AHS and AMS have adequate time to safely walk
between campuses and look at improvements at Brighton/Key Route to improve crossing
safety
Meeting with Cornell Principal Cat Floresca (5.29.25)
Attendees
• Justin Fried, CDD
• Cat Floresca, AUSD
• Kim Trutane, AUSD
Conversation
• Walking school bus discussed at Coffee with a Principal, principal didn’t know details but
would be useful to circulate more widely and support
• Interest in suggestion of library as potential park and walk spot for drivers
• Revisit loading zones, extend primary ones, reduce congestion and poor behavior that have
spillover walk/bike safety concerns
• TK/K drop-off on Talbot, K on Talbot line up in front of doors, outside, open to street; TK in
little TK play yard on Talbot entered from gate to south, at 8:30 teacher brings them in, still a
process, takes 5+ minutes, parents doing more than just dropping off from car
• 1-6th line up in main yard, entrance from southern yard gate on Talbot and northern yard gate
on Cornell
• Dropping off on opposite side of street unsafe and narrow roads for busy loading behavior
and two-way vehicle traffic
Suggestions/recommendations
• Green zone loading area on Talbot to match TK/K drop-off needs
• Focus bike/ped access to Talbot gate entrance
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 89
• Focus driving drop-off for 1-6th on Cornell northbound enter from Marin, expand white zone
and remove second zone by second gate that is not opened to match current practice
• Messaging push to parents that bike route and ped route / crossing on Talbot; parents
should drop off on Cornell entering northbound
• If parking and walking in, should be done from further away – walking school bus from
north, suggest library park and walk location from south
• Solicit parent volunteers to support behavior push at beginning of school year
• Consider turn restrictions / reinforcement of one-way driving circulation at pick-up/drop-off
Meeting with Albany Children’s Center (6.10.25)
Attendees
• Justin Fried, CDD
• Ben Matlaw, CDD
• Josh Reed, AUSD
Conversation
• Cars drive too fast on Jackson in front of the Children’s Center
• 85 students attend Children’s Center at peak of year ( 71 currently)
• Deliveries occur at the back of the school, which is difficult for trucks, which have to go up
the hill (Hillside or Washington)
• No designated parking for school staff on premises
• 16 staff total (12 staff on site at any given time)
• Majority of students get dropped off via car (~5 students arrive via bike, ~5 students arrive
via foot)
• People occasionally park in or in front of neighbors’ driveways, but this has become less of
an issue as of late
o Mostly because Josh has reached out to neighbors and given them a number to
contact if they’re having an issue
• 20-minute parking zone outside of school
o currently not enforced
o Josh doesn’t want it enforced because there is one staff member who is disabled
and likes to park there
o Potential to update signage to limit 20-minute parking to pick-up/drop-off hours and
allow for longer-term parking during middle of school day
• There is talk about increasing enrollment at school
o If this happens, the school may want to revisit 20-minute parking zone (extending
and/or enforcing zone)
• Washington can get a little “dicey”
o Street is too narrow for all modes that use it
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 90
Suggestions/recommendations
• Fix curb in front of school (currently falling apart)
• Update 20-minute parking zone outside of school to pick-up/drop-off hours and allow for
longer-term parking during middle of school day
• Figure out way to slow down cars along Jackson Street (cars drive too fast)
Meeting with Marin Elementary Principal Melissa Pfohl (6.11.25)
Attendees
• Justin Fried, CDD
• Ben Matlaw, CDD
• Melissa Pfohl, AUSD
• Kim Trutane, AUSD
Conversation
• Loading zones = full-on brawls
• Easier in beginning of year when principal can direct traffic
o Important for it to be principal for street cred
• Curtis is worse than Santa Fe because there’s no traffic light
• Bike rodeo has been an amazing success
• Have a lot of bike parking but not a lot of demand
• Walking school bus was in effect for two years but didn’t get many takers
Suggestions/recommendations
• Program lights to allow for diagonal crossing 15 minutes before and after bell at beginning
and end of day
• Initiate a citywide effort to get parents to understanding what loading zones are for
• Support for Lt. Kurland’s idea to put vertical delineators alongside loading zones
o On Curtis and Santa Fe, but prioritizing Curtis
• Make Curtis look more like a loading zone/figure out a way to make sure folks know it’s a
loading zone
o Replace planning strip with concrete/permeable pavement
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 91
ENGAGEMENT ON UPTOWN
SOLANO AVENUE
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 92
Background & Prior Direction
Wide variation in priorities amongst pedestrian space, bicycle facilities,
and vehicle access reflected in public and business discussions.
ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX STAKEHOLDER ENGAGEMENT DETAILS | 93
Background & Prior Direction
Considerations raised during technical, public, and business discussions
include:
•Parking and loading impacts
•Traffic flow impacts
•Construction cost, duration, and business impacts
•Parallel parking challenging for some
•Motorists needing to walk across bike path from parking spaces
•Disparate impacts to parking and access on north side versus south side
•Emergency response concerns, reduced flexibility of roadway use
•Changes necessary to existing parklets
•One-way bikeway compliance and operational questions
| 94ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVENUE BIKE FACILITY ANALYSIS
APPENDIX C: UPTOWN SOLANO AVENUE
BIKE FACILITY ANALYSIS
| 95ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Appendix C: Uptown Solano
Avenue Bike Facility Analysis
This appendix provides a summary of analysis and discussion conducted as part of the
development of the Active Transportation Plan (ATP) regarding bicycle facilities on Solano
Avenue. This work was identified as a next step following conclusion of the Solano Avenue
Complete Streets Study in 2019. This analysis informed the recommendation in the ATP
for inclusion of the eastbound protected bikeway as a component of an Uptown Solano
Avenue Streetscape Improvements project and will serve as a starting point as this project
proceeds through project planning and design.
Summary
This appendix is divided into several sections, summarized below, reviewing a wide range
of technical details and considerations.
Concept Overview. The Eastbound Protected Bikeway concept features an
asymmetrical bikeway and parking layout consisting of a shared bicycle-vehicle lane in
the westbound downhill direction (alongside parallel parking) and protected bicycle lane
in the eastbound uphill direction (alongside angled parking). This is intended to provide
improvement in safety and access for all modes of travel while minimizing the overall
change to motor vehicle parking along the corridor. A sample cross-section and layout was
prepared to analyze the concept. It does not reflect a proposed project design.
Guidance for Asymmetrical Bikeways. This is a recognized treatment to balance
multimodal demands on constrained, sloped streets. The separated eastbound bikeway,
characterized as a “climbing lane,” would provide a more comfortable experience for
uphill biking where speeds tend to be lower than motor vehicle traffic. The westbound
direction would remain a shared lane, taking advantage of the fact that biking speeds
in the downhill direction tend to approach motor vehicle speeds (around 15-25 mph, or
Solano Avenue’s 20 mph posted speed limit). However, the existing motor vehicle volume
above 8,000 average daily traffic (ADT) exceeds the guidelines for shared lane facilities. As
such, the westbound biking/rolling facility would be appropriate only for stronger, more
confident riders.
Stakeholder Priorities. Stakeholder input reflects a clear split in priorities for Solano
Avenue. Business respondents generally emphasized maintaining parking, loading
access, and overall street function, with a preference for extending lower Solano-style
improvements. Some resident respondents similarly emphasized maintaining vehicle
access and a preference for retaining angled parking on both sides of Solano Avenue.
Other respondents supported adding dedicated bicycle facilities, including the eastbound
protected bikeway concept. Across all groups, there is no single preferred approach,
and tradeoffs between access, safety, and use of limited street space remain a central
| 96ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
consideration.
Design Features and Considerations. This concept is consistent with applicable
national and state design guidance. As drafted, the eastbound protected bikeway provides
7’ of rideable width, and the buffer and angled parking create substantial separation
from moving traffic while allowing space for turning vehicles to establish sightlines. The
westbound shared lane is less comfortable due to high traffic volumes, but its downhill
orientation makes it more appropriate for a shared facility than the eastbound side.
Shared-lane markings and signage will support proper positioning for downhill cyclists
traveling at speeds comparable to vehicles.
Some elements remain uncertain at this early stage and will require further evaluation.
This includes parking, loading, and transit design, as well as user behavior that may not be
fully understood until implemented. Potential issues include double-parking, wrongway
riding in the protected bikeway, and other unpredictable responses to the new configura-
tion. While the design aims to calm traffic and balance all modes, long-term outcomes will
depend on real-world use and observation.
Parking, Loading, and Curb Management. The proposed concept results in an
estimated net parking loss between 0% and 10% compared to current conditions. This
net change will be affected by a variety of detailed design factors including intersection
design, curb ramp locations, bus stop layout and areas needed to provide clearance from
crosswalks and driveways. Future phases of the project may identify additional shortterm
loading zones, accessible parking spaces, or time-limited spaces based on frontage condi-
tions and user needs.
Public Transit Integration. The concept prepared includes bus stops that broadly
conform to AC Transit design guidelines for in-lane stops, although further site-specific
evaluation will be necessary to refine stop lengths, bus turning paths, accessibility
features, and potential amenities. The concept also removes existing bus stops at several
locations consistent with recommendations from the 2019 Solano Avenue Complete Streets
and Corridor Revitalization Study.
Other Considerations. In addition to engineering factors, several broader
considerations will influence future design decisions. These include emergency response
needs, construction impacts, and flexibility for special events, deliveries, and day-to-
day operations. The concept will also require coordination with transit operations, ADA
requirements, and existing curbside uses such as parklets. These factors will be evaluated
further as the project advances.
Examples of Similar Facilities. Many similar facilities have been implemented across
California and Washington. This appendix concludes with brief summaries of eight such
facilities.
| 97ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Concept Overview
Uptown Solano Avenue is the 3,300-foot section between Masonic Avenue and Tulare
Avenue. It serves multiple functions with a relatively narrow 80-foot right-of-way:
◼ A designated truck route for commercial truck activity in Albany and Berkeley
◼ An AC Transit bus route with local service (Line 18) and transbay service (Line G)
◼ A main street retail corridor with significant pedestrian activity
The Eastbound Protected Bikeway concept reorganizes parking to one side parallel
and the other side 60-degree angle parking with approximately 11 feet of right-of-way
provided to an uphill cycle track. A sample cross-section is shown in Figure 1.
Figure 1: Sample Cross-Section (Looking East)
The curb-to-curb cross-section from north to south (westbound to eastbound) for the
concept is:
◼ 8’ westbound parallel parking (modified from existing 45-degree angled parking)
◼ 11’ westbound shared vehicle lane (bike route/Class III bikeway indicated with
shared-lane marking or “sharrow”)
◼ 16’ eastbound vehicle lane
◼ 14’ eastbound 60-degree angled parking (modified from existing 45-degree
angled parking)
◼ 11’ eastbound protected bikeway (4’ buffer with parking stops and 7’ bikeway)
| 98ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
The Eastbound Protected Bikeway concept would balance the interests of multiple
modes and achieve several of the City’s objectives:
◼ Maximize space efficiency within the corridor’s constrained right-of-way
◼ Preserve a substantial amount of on-street parking compared to the current
condition
◼ Provide new benefits for active transportation
Guidance for Asymmetrical
Bikeways
This type of asymmetrical bikeway treatment is a recognized tool in urban design
standards for hilly corridors, constrained streets, and mixed-use environments where
available space or curbside demands prevent symmetrical facility placement. Two leading
publications provide the most guidance for this type of asymmetrical bikeway facility:
◼ NACTO Urban Bikeway Design Guide (3rd Edition): Section 3.1.3: Bikeway
Operations“Where necessary, the asymmetrical application of constrained bike
lanes or protected bike lanes may still be appropriate, as these designs will improve
safety for everyone on the street.”
◼ AASHTO Guide for the Development of Bicycle Facilities (5th Edition): Section 9.10:
Bicycle Lanes on One Side of a Two-Way Street
Additional guidance documents, including the FHWA Separated Bike Lane Planning & Design
Guide and the Caltrans HDM Chapter 1000, emphasize the overall importance of a context-
sensitive, flexible design approach for bikeways in constrained environments and the
selection of facility types based on factors such as roadway conditions, traffic operations,
and adjacent land uses. Taken together, these sources provide a clear foundation for the
proposed asymmetrical bikeway layout. While empirical data on identical configurations
may be limited, the frequency with which similar designs have been implemented in urban
corridors across the U.S. supports the conclusion that this approach is reasonable and
aligned with accepted standards.
A key characteristic that makes this layout advantageous for Solano Avenue is its slope.
The 3,300’ segment reviewed in this memorandum has an average slope of 3.1% uphill in
the eastbound direction. The steepest portion is the 600’ segment between Key Route
Boulevard and Ramona Avenue where the maximum slope is 5-6%. In these types of
conditions, uphill biking/rolling tends to travel at 5-10 mph while downhill riders often
travel closer to 15-25 mph, more closely matching motor vehicle traffic.
| 99ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Solano Avenue’s existing motor vehicle volume above 8,000 ADT exceeds the guidelines
for shared lane facilities. As such, the westbound biking/rolling facility would be
appropriate only for stronger, more confident riders.
Stakeholder Priorities
Opinions on priorities for improvement on Solano Avenue are strong and varied.
Different respondents to city engagement place different priorities amongst pedestrian
space, bicycle facilities, and vehicle access. During the network development (Phase
2), an online survey included a question on the Solano corridor. Of the 80 respondents,
approximately half responded to this question. Staff subsequently sent a survey to
businesses along Solano to try and gather additional stakeholder feedback. This survey
was eventually shared more broadly. Based upon survey responses identifying as a
business owner or not, responses from this survey are presented in Table 1.
While none of these surveys are representative, they point to a preference for extending
lower Solano style improvements amongst businesses and a preference for the eastbound
protected bikeway among other survey respondents. Second place is tied amongst
business responses between utilizing parking reconfiguration for wider sidewalks or an
uphill bicycle facility; amongst others the second place preference is to extend lower
Solano improvements over reconfiguring parking for wider sidewalks.
Table 1: Survey Response Summary
Improvement Phase 2 Business
Owner
Non-Business
Owner
Extension of Lower Solano 13 (35%)22 (65%)16 (31%)
Eastbound Protected Bikeway 18 (49%)6 (18%)25 (49%)
Parking Reconfiguration for Wider
Sidewalks
6 (16%)6 (18%)10 (20%)
Top business respondent priorities included parking and loading, lighting, street trees,
and public art.
In one-on-one meetings with business owners, issues raised included: concern over
construction duration, high overall cost, and construction impacts on businesses; high
cost of the project for the benefit; parallel parking would discourage some vehicle users;
and risks for pedestrians crossing bike path from parking spaces. Business owners also
highlighted the differences in impacts on the north side of the street versus the south
side. Business one-on-one recommendations for priorities included slowing vehicle
speeds, addressing loading and delivery needs, improving sidewalks and addressing
sidewalk pinch points, improving pedestrian safety, reducing vacant storefronts, and
keeping parklets over widening sidewalks more generally. Multiple retailers that draw
more out-of-town shoppers or that sell larger items highlighted high customer driving
| 100ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
needs that could not be easily substituted by other modes.
More broadly, responses continue to be split, with some strongly for facilitating cycling
on Solano and others strongly for focusing on other modes on Solano with parallel
facilities and cross-street access for cyclists. Many preferring bicycle facilities on Solano
also want two-way protected facilities. Staff has also received a number of questions
regarding the possibility to narrow the uphill bike facility in the concept for additional
vehicle lane or sidewalk width.
Design Features and
Considerations
Some elements of the concept remain uncertain at this early stage of development and
will require further evaluation and refinement. This includes analyzing the potential
impacts on biking/rolling comfort and traffic operations from westbound parallel-parking
movements and potential double-parking. Additionally, a narrowed travel lane may
require additional designated loading zones to allow access to the commercial district
without disrupting traffic flow. This would require allocating additional space from
general parking along Solano Avenue and/or on side-street approaches.
Table 2 summarizes the various considerations addressed in this analysis.
Table 2: Summary of Considerations
Category Westbound Eastbound
Biking/Rolling
Conditions
◼ Class III shared lane leverages
natural downhill speeds, but
lacks dedicated space for biking/
rolling
◼ High motor vehicle volumes
exceed guidelines, limiting
biking/rolling to strong &
confident riders only
◼ Potential for door-zone conflicts
alongside parallel parking
◼ Protected bikeway offers
comfortable uphill
biking/rolling experience
◼ Encroachment of ~1’ gutter pan
reduces rideable surface in some
locations
◼ Potential for wrong-way riders
due to lack of protected
westbound facility, but 7’ width
plus 4’ buffer provides passing
space if needed
| 101ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Category Westbound Eastbound
Pedestrian/
Walking
Conditions
• Largely maintains sidewalks
• Reduces size of curb extensions, increasing crossing distances
• Largely maintains existing sidewalks
• Removes existing curb extensions
• Additional design work needed to assess potential for pedestrian refuge islands to narrow crossing distances
Operations &
Intersection
Conflicts
• Double-parked vehicles may impede traffic flow or encourage users to encroach into opposing lane
• Potential visibility challenges
• for entering/exiting vehicles; mitigated by 18’ staging area & overall slow speeds
Drainage &
Maintenance
• Requires re-establishment of inlets where curb extensions are modified
• Standard sweepers can be used
• Requires re-establishment of inlets where curb extensions are removed
• Consistent curb line simplifies flow
• Requires compact sweepers
Parking,
Loading
& Curb
Management
• Potential net loss of 0%-10% of parking spaces compared to current condition
• Additional space for loading, ADA, or parklets will reduce general parking further
• Potential net loss of 0%-10% of parking spaces compared to current condition
• Additional space for loading, ADA, or parklets will reduce general parking further
• Conflicts may arise from loading activity crossing separated bikeway
Public Transit
Integration
• Removes stop at Ramona Ave per Complete Streets study; removal of stop at Tacoma Ave requires further study
• Requires further development of stop lengths, bus turning paths, ADA access & potential amenities
• Likely requires boardingislands between bikeway & bus stop
• Removes stops at RamonaAve & Ventura Ave perComplete Streets study
• Requires further development of stop lengths, bus turning paths, ADA access & potential amenities
| 102ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
naturally travel at speeds closer to motor vehicles (often 15-25 mph downhill), reducing
the need for dedicated bike space while retaining curbside functions.
This design approach is consistent with guidance from NACTO, Caltrans, the California
Streets & Highways Code, and emerging practices in constrained urban corridors with hilly
topography. The key references for design guidance are:
◼ NACTO Urban Bikeway Design Guide (3rd Edition)
◼ Caltrans HDM Chapter 1000
◼ California Manual on Uniform Traffic Control Devices (2026 draft)
◼ California Streets & Highways Code §891.9
Cross-Section and Shared Lane Configuration
The westbound cross-section contains:
◼ 7-8’ parallel parking lane along the north curb
◼ 11’ shared motor vehicle/biking/rolling travel lane
◼ Sidewalk maintained along the north side
This layout follows the Class III bikeway treatment with shared lane markings or
“sharrows,” which are one part of a larger toolkit for bike routes in urbanized settings. The
NACTO Urban Bikeway Design Guide—which is the basis for most recommendations in the
Active Transportation Plan update currently in progress—recommends speeds of no more
than 25 mph for shared bike facilities with a maximum motor-vehicle volume of 3,000
average daily traffic (ADT). To achieve NACTO’s highest “All Ages and Abilities” standard,
the maximums are 20 mph (which matches the current posted speed limit) and 2,000 ADT.
The concept reviewed in this memorandum does not present an ideal condition for
westbound biking/rolling, but rather is a compromise to balance multimodal demands.
While Solano Avenue generally meets the speed guidelines above, its motor-vehicle
volume above 8,000 ADT substantially exceeds the guidelines for shared-lane facilities—
and therefore this westbound biking/rolling facility would be appropriate only for stronger,
more confident riders.
The proposed 11’ westbound lane would include shared lane markings (sharrows) and
R9-20 “Bicycles May Use Full Lane” signage, in accordance with the draft 2026 California
Manual on Uniform Traffic Control Devices and California Streets & Highways Code §891.9.
Specific marking placement includes:
◼ Initial sharrow within 50’ of each intersection
◼ Spacing of 50’-250’ thereafter
◼ Marking centered 13’ from curb face where adjacent to parking
These markings support lateral positioning away from the door zone and discourage
sidewalk or wrong-way riding, as affirmed by FHWA evaluations of shared lane markings.
Design Features and Considerations:
Westbound (Downhill) Side
The proposed westbound configuration for Solano Avenue between Tulare Avenue
and Masonic Avenue maintains a shared lane (Class III bikeway) for bicycles and motor
vehicles. This configuration leverages the corridor’s westward downslope, where riders
| 103ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Pedestrian/Walking Realm and Curb Extensions
With the exception of some corner treatments as described below, the concept presented
in this memorandum fits within the street’s existing curb-to-curb width. As such, it would
preserve the existing pedestrian realm largely as-is, with little to no change in sidewalk
widths and amenities.
To accommodate this cross-section at intersections, some existing curb extensions
(“bulb-outs”) at corners along the north side must be reduced in size at:
◼ Ramona Avenue
◼ Carmel Avenue
◼ San Carlos Avenue
◼ Santa Fe Avenue
◼ Neilson Street
◼ Peralta Avenue
These reductions are required to preserve a consistent 11’ shared lane and parallel parking
throughout the corridor. Although this slightly increases pedestrian crossing distances at
these intersections, it preserves a consistent lane width and unobstructed path of travel
for all users. Where feasible, future design refinements may consider offset or floating
curb extensions that preserve pedestrian space without intruding into the travel lane.
Operations and Intersection Conflicts
By maintaining an 11’ westbound lane, the concept encourages traffic calming, reinforcing
the corridor’s 20 mph posted speed limit. Downhill bicyclists, often traveling between
15-25 mph, are generally able to maintain pace with vehicle traffic, reducing overtaking
conflicts. However, the narrowed lanes and conversion to parallel parking may encourage
double-parking, which may impede traffic flow or encourage users to encroach into the
eastbound travel lane.
At intersections and driveways, bicyclists benefit from clear sightlines and consistent lane
control. Unlike protected lanes, which can introduce turning conflicts, the shared lane
strategy places bicycles in a more visible position within the vehicular stream, improving
mutual awareness.
However, the lack of dedicated bicycle space means that this treatment may feel less
comfortable for less confident riders, especially during peak periods, in proximity to large
vehicles, and when vehicles are double-parked or making parallel-parking maneuvers.
Emphasis on signing, markings, enforcement, and driver education is essential to reinforce
the shared lane environment.
| 104ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Drainage and Maintenance
The modification of existing curb extensions and the re-establishment of a straight
curb and gutter will alter existing drainage patterns. The concept reviewed in this
memorandum assumes maintaining a continuous curb and gutter along the north side;
however, design features such as inlet spacing likely will need to be adjusted to ensure
proper stormwater collection. Westbound parallel parking runs next to the north curb,
and stormwater runoff will follow that path. Key considerations include:
◼ Ensuring existing inlets are re-established at the curb line where curb extensions
are removed
◼ Maintaining or adding catch basins at new low points
◼ Preserving a consistent cross slope to support drainage and ADA compliance
From a maintenance standpoint, sweeping operations can occur within the shared lane
using standard-width equipment. Sharrow markings and lane signage must be maintained
and refreshed regularly.
Design Features and Considerations:
Eastbound (Uphill) Side
The proposed eastbound bikeway on Solano Avenue is designed as a Class IV protected
facility running along the south side of the street. The corridor rises at an average 3.1%
grade, with sections approaching 5-6% in the eastern segment. These slope conditions
justify separation between uphill bicyclists—typically traveling at 5-10 mph—and faster-
moving vehicles. The key references for design guidance are:
◼ Caltrans Design Information Bulletin (DIB) 89-01: Class IV Bikeway Guidance
◼ Caltrans Highway Design Manual (HDM) Chapter 1000
◼ FHWA Separated Bike Lane Planning & Design Guide
◼ NACTO Urban Bikeway Design Guide (3rd Edition)
Cross-Section and Physical Separation
To create the protected bikeway within the constrained right-of-way, the corridor’s
eastbound cross-section is reconfigured to include:
◼ 16’ eastbound travel lane
◼ 14’ angled parking zone
◼ 4’ painted buffer equipped with parking curb stops
◼ 7’ bikeway, located curbside
◼ Sidewalk along the southern curb, maintained in most locations
| 105ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
The bikeway itself provides 7’ of clear width, meeting the Caltrans DIB 89-01 preferred
clear width for Class IV facilities. In some locations, a 1’ gutter pan is included within
this zone; however, even with this encroachment, the design maintains at least 6’ of
unobstructed, rideable surface, which is greater than the Caltrans minimum standard for
rideable width of 5’. It is also advisable to be above the minimum standard of rideable
width for this facility due to the potential for wrong-way cyclists to use the protected
bikeway.
The adjacent 4’ buffer exceeds the minimum width of 3’ prescribed by the Caltrans DIB
89-01 for parking-protected bikeways. This allows for overhang from parked vehicles and
provides an additional safety factor appropriate for this preliminary level of design.
The resulting 18’ separation between the vehicular travel lane and the bikeway— including
angled parking and buffer—offers substantial protection for bicyclists. While vertical
elements such as flexible delineators are not used, the striped buffer and physical curb
stops between angled parking stalls and the bikeway create clear visual and spatial
separation.
Pedestrian/Walking Realm and Curb Extensions
Similar to the westbound side—with the exception of curb extensions as described be-
low—the concept presented in this memorandum fits within the street’s existing curb-
to-curb width. As such, it would preserve the existing pedestrian realm largely as-is, with
little to no change in sidewalk widths and amenities.
The concept reviewed in this memorandum does require the removal of all existing
curb extensions on the south side of Solano Avenue. These curb extensions—originally
installed to improve pedestrian visibility and reduce crossing distances—obstruct the
proposed alignment of the separated bikeway.
To maintain pedestrian safety and crossing visibility, future design development may
incorporate floating curb extensions or pedestrian refuge islands that extend across the
bikeway at intersections. These treatments would help shorten crossing distances and
improve visibility while maintaining a continuous bikeway alignment. The feasibility and
design of these elements will be evaluated during project development.
Operations and Intersection Conflicts
Parking-protected bikeways are a well-established tool in national and state-level
bicycle design guidance, although the specific characteristics of the concept reviewed
in this memorandum are somewhat unique. The FHWA Separated Bike Lane Planning &
Design Guide defines separated (protected) bike lanes and explicitly identifies on-street
parking as one of the acceptable forms of physical separation between bicyclists and
motor vehicle traffic. Similarly, Caltrans Design Information Bulletin (DIB) 89-01: Class IV
Bikeway Guidance defines Class IV separated bikeways as on-street bikeways separated
from motor traffic by a physical barrier, including on-street parking. The NACTO Urban
| 106ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
BikewayDesign Guide (3rd Edition) further treats protected bike lanes (including parking-
protected variants) as standard, context-sensitive tools for building high-comfort, all-
ages and abilities bikeway networks on urban streets.
Notably, these design guidelines do not distinguish between parallel and angled parking
configurations. As a result, the use of angled parking as the protecting element in the
concept reviewed here reflects an application of professional engineering judgment and
emerging case studies, rather than a prescriptive, angle-specific standard.
This deviation is mitigated by the corridor’s design geometry and the typical behavior of
users of slow-speed streets. On local streets like Solano Avenue, corner sight distance
criteria from traditional highway design manuals are applied more flexibly than on high-
erspeed arterials, with a greater emphasis on context-sensitive tools such as daylighting
at crosswalks. In practice, drivers on constrained city streets often slowly encroach to-
ward or partially into crosswalk areas to assess gaps and turning safety before entering
the travel lane. This Solano Avenue concept relies on this operational behavior and the
low posted speeds on the local main street as compared to highway-style sight distance
tables.
Within this framework, the proposed parking-protected uphill bikeway on Solano Avenue
creates approximately 18’ of lateral separation between bicyclists and moving traffic.
While the angled parking introduces additional visual clutter compared to parallel parking,
the 18’ envelope occupied by parked vehicles and the buffer provides a generous area
for turning drivers space to slowly encroach, align themselves, and look for approaching
traffic in the travel lanes. Similarly, vehicles entering intersections or driveways from the
eastbound travel lane can turn across the 18’ staging area at low speeds, allowing for
visibility checks before crossing the bikeway. While this condition does not meet strict
FHWA “daylighting” guidelines around driveways, the available maneuvering and staging
space serves as a mitigation to enable safer interactions at driveways.
Additionally, because the parking-protected facility is located on the uphill side where
biking/rolling users are expected to travel at relatively lower speeds (5-10 mph), this
provides crossing vehicles more time to react as compared to a flat or downhill segment.
Taken together, the use of parking as a separating element, the 18’ of staging space
provided by the angled parking and buffer, and the anticipated lower speeds in the
uphill direction support the conclusion that the proposed parking-protected bikeway
conforms with prevailing design standards for sight distance and driveway operations
on local streets. While detailed intersection and driveway design will still be required in
later phases, the concept as currently shown is consistent with accepted guidelines for
parking-protected bikeways.
Drainage and Maintenance
By keeping the bikeway at street level and removing curb extensions, existing drainage
patterns will shift as surface runoff flows naturally along the curb line. As with the
| 107ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
westbound side, design should maintain adequate inlet spacing and evaluate locations for
catch basins at low points.
From a maintenance standpoint, the inclusion of a buffer zone preserves access for
service vehicles and personnel. However, the bikeway’s narrower protected space will
require compact sweepers to effectively clean the facility, and regular sweeping will be
necessary to manage debris accumulation.
Parking, Loading, and Curb
Management
The concept reviewed in this memorandum includes reconfiguration of on-street parking
in both directions to accommodate multimodal improvements. Overall, the proposed
concept is estimated to result in a net corridor-wide parking loss of 0%-10% compared to
current conditions.
While a significant portion of existing parking is retained, the configuration, location,
and total number of spaces will be adjusted to align with the proposed cross-sections
and design constraints. Future phases of the project may identify additional short-term
loading zones, accessible parking, or time-limited spaces based on frontage conditions
and user needs. Additionally, side streets may offer supplemental parking or loading to
offset localized reductions.
Westbound (Downhill) Parking
On the westbound side, the design proposes a conversion from 45-degree angled
parking to parallel parking along the north curb. This change accommodates a shared
lane (Class III bikeway) that enables downhill bicyclists—traveling at vehicle-comparable
speeds of 15-25 mph—to share the lane with motor vehicles. Parallel parking presents
competing benefits and tradeoffs compared to angled parking for both motor vehicles
and biking/rolling:
◼ Provides clearer sight lines of the adjacent eastbound travel lane for drivers
exiting parking spaces.
◼ Eliminates vehicle back-out conflicts into a shared bike lane.
◼ Allows for better lane control and consistent lane width for cyclists.
◼ May be more difficult for drivers to enter compared to angled parking.
◼ Leaves less passing room in the event of double-parking.
◼ Introduces a new risk to cyclists in the form of “dooring” (motor vehicle users
opening doors into the bikeway).
| 108ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Considering these factors and the overall goals of the project to balance competing
multimodal demands, eastbound parallel parking provides a reasonable solution that
minimizes potential tradeoffs. The City will need to set curb management policies
governing on-street parking, loading, accessible parking, and other elements to maximize
effective use of parking and other curb space.
Eastbound (Uphill) Parking
In the eastbound direction, the proposed design retains and slightly expands on-street
parking along the south curb by changing the angled parking from an existing condition of
approximately 45 degrees to 60 degrees. This angled parking not only serves commercial
frontage and short-term curb use but also plays a critical role in buffering the Class IV
bikeway.
The angled parking configuration maintains vehicular convenience while also calming
eastbound traffic by visually narrowing the lane. In constrained commercial corridors, this
combined function of parking as both an access feature and a protective element is an
accepted practice.
Public Transit Integration
The project section of Solano Avenue is currently served by two AC Transit bus routes:
◼ Line 18: Local service connecting University Village, Berkeley, and Oakland.
Generally operates at 15-minute service frequency all day in both directions.
◼ Line G: Commuter service connecting El Cerrito, Albany, and Berkeley to the San
Francisco Salesforce Transit Center. Generally operates four morning trips to San
Francisco in the 7-9am peak period and four afternoon trips from San Francisco in
the 4-7pm peak period.
The concept under review in this technical memorandum removes an existing pair of
bus stops at Ramona Avenue (in both directions) consistent with recommendations from
the 2019 Solano Avenue Complete Streets and Corridor Revitalization Study. That study
also recommended the removal of the existing bus stop pair at Tacoma Avenue/Ventura
Avenue. The draft concept presented here removes the eastbound stop at Ventura
Avenue, but does not modify the westbound stop at Tacoma Avenue as this requires
further study of this unique intersection. If the Tacoma Avenue bus stop is removed, it
could provide an additional two parallel parking spaces in the westbound direction, but
this is not assumed in the current parking estimates.
All bus stops broadly conform to AC Transit’s Transit-Supportive Design Guidelines and were
reviewed by AC Transit staff. The draft concept assumes an in-lane boarding configuration
for each stop, which minimizes curbside impacts and avoids the space and circulation
challenges posed by pull-out bays in a constrained corridor. In-lane boarding also enables
buses to stop directly in the travel lane without having to re-merge,improving efficiency
and dwell time performance. On the eastbound side, where a protected bikeway is
| 109ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
proposed, this configuration will require boarding islands between the bikeway and
travel lane to facilitate safe and accessible boarding.
These assumptions for the integration of public transit will require further development
review as the project progresses. Specifically, additional design coordination should
include more detailed site-specific evaluations of stop lengths, bus turning paths, ADA
access, and potential transit-user amenities.
Other Considerations
In addition to considerations discussed above raised during public engagement and in the
technical analysis, a number of non-engineering considerations have also been identified
for the decision regarding bicycle facilities on Solano which will require additional study
and consideration as part of future project development. These include:
◼ Albany Fire Department requires access to the sides of fire trucks when
responding to calls on Solano Avenue. Maintaining 15 feet of width in either
direction allows for a ‘reasonably safe’ work environment for AFD crews when
parked in one of the lanes of travel. Future project development will need to look
at options to maintain 15 feet in the westbound direction (for example, reducing
the bikeway and buffer to 5 feet and 2 feet respectively) and/or operational
changes closing Solano to traffic when AFD is responding to an incident on Solano
Avenue to identify options and design direction.
◼ General concerns with narrowing the westbound vehicle travel lane by
approximately 3-4 feet and overall curb-to-curb width by 11 feet. Additional
loading and delivery management including siting of additional loading zone
locations may be required in conjunction with the concept.
◼ Narrower lane and curb-to-curb widths also reduce flexibility with use of the
roadway for construction, evacuation, and special events. This may require
additional design or operational strategies.
◼ The concept provides minimum 11-foot travel lanes and in-lane boarding for AC
Transit service. AC Transit multimodal design guidelines would inform future bike
facility design at bus stop locations.
◼ Existing restaurant parklets and bus stop parklets would need to change to utilize
the new parking configuration.
◼ With narrow sidewalks along Solano Avenue, pedestrians may utilize the bicycle
lane when the sidewalk is congested. A one-way facility would also introduce
potential use of the bicycle lane for travelling in the opposite direction of the
design intent.
◼ Future project development will need to evaluate ADA parking requirements, bus
stops, drainage needs, green infrastructure requirements, and ADA sidewalk and
business access requirements.
| 110ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
◼ Locations for additional study include the Masonic Avenue to Key Route
Boulevard block (where there is an existing left-turn lane) and the Tacoma
intersection (where there is a sharp angle intersection and Berkeley jurisdiction on
the Tacoma approach).
Examples of Similar Facilities
To support the feasibility of the proposed concept for Solano Avenue, the project team
conducted a brief review of other urban corridors where similar bicycle facility treatments
have been implemented. These examples are not intended to be direct performance
evaluations, as detailed before-and-after data on bicycle volumes, collision history, or
user satisfaction was not available for most of the corridors reviewed. Instead, they serve
as qualitative references, offering a comparative look at how other jurisdictions have
applied similar design strategies in contextually relevant environments.
Each of the selected corridors shares key characteristics with Solano Avenue, such
as mixed commercial and residential land uses, asymmetrical bikeway configurations,
parking-protected bikeways, transit service, and constrained rights-of-way requiring
creative curbside trade-offs. While the specific design details vary, these examples
demonstrate that similar approaches have been successfully implemented in diverse
urban settings.
The intent of including these examples is to show that the proposed concept for
Solano Avenue is not unprecedented. Rather, it reflects an emerging design pattern in
multimodal street planning. Given the number and diversity of comparable corridors
where these treatments have been deployed, it is reasonable to conclude that the
proposed bikeway concept—particularly the use of a protected climbing lane and shared
downhill lane—has a practical foundation and is likely to function effectively in this
context. Table 3 lists the example locations and some of their key characteristics, with
further discussion on the following pages.
| 111ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Table 3: Case Studies of Similar Facilities
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
Polk Street
San Francisco
Commercial/
re s i d e n t i a l
mixed use
X Parallel both sides
20th Avenue
San Francisco
Residential X Parallel both sides
Fremont Avenue
Seattle
Commercial/
re s i d e n t i a l
mixed use
X Parallel both sides
Voltaire Street
San Diego
Commercial/
re s i d e n t i a l
mixed use
X Parallel both sides
Avenue 51
Los Angeles
Commercial;
residential
X Parallel both sides
Hearst Avenue
Berkeley
Institutional;
park
X Reverse angle one
side; parallel one
side
L i n c o l n
Boulevard
San Francisco
Park X None
Bay Street
San Francisco
Residential;
park; school
X X Reverse angle one
side; parallel one
side
| 112ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Polk Street, San Francisco
Between Union and California Streets, Polk Street in San Francisco (sometimes referred
to as “Lower Polk”) features a downhill shared bike route (Class III bikeway) approximately
12-13’ wide paired with an uphill bike lane approximately 6-7’ wide without buffer. Both
sides of the street have parallel parking, parklets, and curb extensions. The street also
serves a local bus route operated by San Francisco MTA.
Table 4: Key Characteristics, Polk Street
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
OnStreet Parking
Polk Street
San Francisco
Commercial/
re s i d e n t i a l
mixed use
X Parallel both sides
Figure 2: Polk Street, San Francisco
| 113ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
20th Avenue, San Francisco
20th Avenue in San Francisco’s Sunset neighborhood features a shared bike route
(Class III bikeway) approximately 12-13’ wide paired with an uphill buffered bike lane
approximately 8’ wide (6’ lane with 2’ buffer). The street also includes speed humps and
parallel parking on both sides.
Table 5: Key Characteristics, 20th Avenue
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
20th Avenue
San Francisco
Residential X Parallel both sides
Figure 3: 20th Avenue, San Francisco
| 114ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Fremont Avenue, Seattle
Fremont Avenue in Seattle’s Fremont neighborhood features a downhill shared bike route
(Class III bikeway) approximately 10-11’ wide paired with an uphill bike lane approximately
5’ wide without buffer. Both sides of the street have parallel parking, plus painted curb
extensions with delineators near key intersections. The street also serves a local bus route
operated by King County Metro.
Table 6: Key Characteristics, Fremont Avenue
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
OnStreet Parking
Fremont Avenue
Seattle
Commercial/
re s i d e n t i a l
mixed use
X Parallel both sides
Figure 4: Fremont Avenue, Seattle
| 115ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Voltaire Street, San Diego
Voltaire Street in San Diego’s Point Loma neighborhood has a downhill shared bike
route (Class III bikeway) approximately 11’ wide paired with an uphill striped bike lane
approximately 5.5’-6’ wide without buffer. Both sides of the street have parallel parking,
and the street also serves a local bus route operated by San Diego MTS.
Table 7: Key Characteristics, Voltaire Street
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
Voltaire Street
San Diego
Commercial/
re s i d e n t i a l
mixed use
X Parallel both sides
Figure 5: Voltaire Street, San Diego
| 116ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Avenue 51, Los Angeles
Avenue 51 in Los Angeles’s Highland Park neighborhood features a downhill shared
bike route (Class III bikeway) approximately 10’-11’ wide paired with an uphill bike lane
approximately 5’ wide without buffer. Both sides of the street have parallel parking.
Table 8: Key Characteristics, Avenue 51
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
Avenue 51
Los Angeles
Commercial;
residential
X Parallel both sides
Figure 6: Avenue 51, Los Angeles
| 117ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Hearst Avenue, Berkeley
Hearst Avenue in Berkeley, east of Oxford Street on the UC Berkeley campus, has a
separated westbound and eastbound roadway due to existing grades. The downhill
(westbound) side features a shared bike route (Class III bikeway) approximately 12’-13’
alongside parallel parking and a loading zone. The uphill (eastbound) side features a
buffered bike lane approximately 5’-6’ wide with 1’-2’ buffer, and no parking. The street
also serves several local bus routes operated by AC Transit and UC Berkeley.
Table 9: Key Characteristics, Hearst Avenue
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
Hearst Avenue
Berkeley
Institutional;
park
X Reverse angle one
side; parallel one
side
Figure 7: Hearst Avenue, Berkeley
| 118ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Lincoln Boulevard, San Francisco
Lincoln Boulevard in San Francisco’s Presidio district features a downhill shared bike
route (Class III bikeway) approximately 12’ wide paired with an uphill buffered bike lane
approximately 6’-8’ wide (4’-6’ lane plus 1’-2’ buffer). The street does not include parking
on either side.
Table 10: Key Characteristics, Lincoln Boulevard
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
Lincoln
Boulevard
San Francisco
Park X None
Figure 8: Lincoln Boulevard, San Francisco
| 119ALBANY ACTIVE TRANSPORTATION PLAN 2026 APPENDIX UPTOWN SOLANO AVE BIKE FACILITY ANALYSIS
ALBANY ACTIVE TRANSPORTATION PLAN 2026
Bay Street, San Francisco
Bay Street in San Francisco, between Fillmore Street and Laguna Street, has an
asymmetrical bikeway design that provides a different example than the previous cases.
While Bay Street’s curb-to-curb width of approximately 80’ is not an apt comparison to
Solano Avenue, its uphill side contains a bikeway protected by angled parking, similar
to the proposed concept for eastbound Solano Avenue. The bikeway is approximately
12’ wide (8’ bike lane with a 4’ buffer) and borders Moscone Park and a middle school,
including several driveways. The parking is reverse-angle, which differs from the
proposed Solano concept, but the two cases are functionally similar in terms of bikeway
operation.
Table 11: Key Characteristics, Bay Street
Street Land Use
Context
Asymmetrical
Bikeway
P a r k i n g
P r o t e c t e d
Bikeway
On-Street Parking
Bay Street
San Francisco
Residential;
park; school
X X Reverse angle one
side; parallel one
side
Figure 9: Bay Street, San Francisco